-
Point Paterson - Port Pirie area. Progress reports on work carried out prior to grant of a special mining lease, for the period June 1962 to November 1969.
The applicant proposes during the two year SML period to undertake a work and study programme to determine the economic feasibility of developing a seawater salt recovery complex on the areas applied for, which will be capable upon completion of the...-
Document
Published: 07 Nov 1969
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
Wilkatana. Progress reports to licence expiry/renewal, for the period 1/4/1963 to 31/3/1964.
TARGET: Brine in fractures within a 200 foot thickness of the Wilkawillina Limestone, for salt production. EXPLORATION: Drilling of one rotary mud hole to 175.56 m, groundwater sample analyses, water yield pump tests, experimental salt recovery via...-
Document
Published: 13 Apr 1964