Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Prospect Hill. Annual reports for the period 25/7/2006 to 24/7/2018.
Continued evaluation of possible economic primary tin oxide mineralisation at three known separate occurrences in the Prospect Hill area, lying 20 km north-west of Moolawatana Homestead, has focussed on the untested zone immediately below the known...-
Document
-
Prospect Hill. Progress reports to licence expiry/full surrender, for the period 14/6/1989 to 13/6/1990.
Known fine-grained cassiterite vein mineralisation occurring at Prospect Hill was investigated via detailed geological mapping (at 1:1000 scale), ground magnetic surveying and the conduct of metallurgical testwork. Out of this work it was concluded...-
Document
-
RB 00643 Contact process. Progress report no. 1.
This report describes investigations conducted in the six month period ended 30/6/59. Features of the process have been demonstrated to senior members of various Sections. Preliminary laboratory tests for the recovery of cassiterite were carried out...-
Document