-
Bendigo Station. Progress reports to licence expiry/renewal, for the period 6/8/1987 to 5/8/1992.
Copper and gold exploration comprising outcrop, stream sediment and soil geochemical sampling, and the conduct of ground magnetic and IP surveys, plus RC percussion (67 vertical holes, total 6624 m) and diamond cored tail drilling (in 2 holes, total...-
Document
Published: 02 Jul 1992
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Beltana. Progress and final reports to licence expiry for the period 18/12/1969 to 17/12/1970.
Ongoing exploration of copper prospects within diapiric raft blocks of Adelaidean metasediments at Beltana has concentrated on the vicinity of historic underground mine workings where evidence of primary sulphide mineralisation can still be seen at...-
Document
Published: 29 Oct 1970