-
RB 59/00126 Sir Joseph Banks Islands, Spencer Gulf. Geological reconnaissance (appendices not published).
There is no abstract created for this record-
Document
Published: 01 Jan 1967
-
RB 55/00065 Woodside (Lakes Entrance) Oil Co. NL. Bundy 1, NSW. Palaeontological report.
Bundy No. 1 well near the eastern margin of the Murray Basin intersected a sequence 1340 feet thick of non marine lignitic sands and silts of Tertiary age. The oldest are Eocene and the youngest probably Pliocene. The well bottomed in granite at 1340...-
Document
Published: 01 Jan 1962
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 1909
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 1919
-
The Murray Basin Project. Joint progress reports and joint final report to remnant licences' full surrender, for the period 7/10/1980 to 6/12/1984.
Thirteen contiguous exploration licences located along the western margin of the Tertiary Murray Basin were taken up by CRA to search for economic buried brown coal / lignite deposits of the type already known from small discoveries that had been made...-
Document
Published: 07 Mar 1985
-
RB 67/00105 Murray Bridge to Onkaparinga pipeline pumping station no. 1, primary pumping station. Geological and geophysical investigations progress report 2, design stage - EWS Department.
The site of a pumping station at Murray Bridge was investigated by 1310m of seismic refraction traverses, a push tube-diamond cored hole to 41.61m, and two cable tool holes to 44.68 and 48.86m. The site is underlain by Recent river clays and sands...-
Document
Published: 01 Jan 1967
-
RB 68/00025 Reconnaissance geological survey of the STREAKY BAY and NUYTS 1:250 000 areas.
The Streaky Bay and Nuyts 1:250 000 map areas are located on the western side of Eyre Peninsula. Precambrian greenschist and amphibolite facies metamorphics of the Gawler Platform are intruded by Lower Proterozoic or Carpentarian granites, gneisses...-
Document
Published: 25 Feb 1969
-
RB 72/00161 Explanatory Notes for the LINDSAY 1:250 000 geological map.
The LINDSAY 1 :250 000 sheet area occupies parts of the southern Musgrave Block and the northern Officer Basin, in the North West Province of South Australia. It is entirely contained by the Great Victoria Desert. The oldest rocks are gneisses of...-
Document
Published: 21 Aug 1972
-
RB 73/00008 Geological survey, Torrens Hinge Zone Project, Bute region. Report no. 1.
This report outlines the history and concept of the Torrens Hinge Zone project. An account is given of the regional geology, geophysics, geochronology and stratigraphic drilling in the Bute region and adjoining areas of northern Yorke Peninsula. An...-
Document
Published: 01 Jan 1973
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document
-
RB 2016/00003 South Australian mineral resource production statistics for the six month [period] ended 30 June 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Mar 2016
-
RB 2016/00033 South Australian mineral resource production statistics for the six month [period] ended 30 June 2016.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2016, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2016
-
RB 2012/00008 Abminga bedrock drilling program 2001.
The Abminga bedrock drilling program was initiated in 1999 as part of the Targeted Exploration Initiative of South Australia (TEISA) strategy conceived by the SA Government and implemented through PIRSA's Mineral Resources Group. Drilling was proposed...-
Document
Published: 01 May 2012
-
RB 2016/00006 South Australian mineral resources production statistics for the six month [period] ending 31 December 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2015
-
RB 2015/00020 South Australian mineral resources production statistics for the six month [period] ending 31 December 2014.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2014, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2014
-
Heartbreak Bore (part of Afmeco's Tarcoola Joint Venture Project). Progress reports and final report to licence expiry/full surrender, for the period 16/1/1980 to 15/1/1982.
Portions of regional airborne radiometric and magnetic surveys, plus a small part of the HW-IV seismic refraction traverse, and 20 line km of gravity and ground magnetic surveys, were undertaken by joint venture operator Afmeco as part of its Project...-
Document
-
Mount Treloar (NW of Oodnadatta). Progress and final reports for the period 30/6/80 to 29/12/80.
Follow-up investigations of possible buried channel redox front uranium mineralization on the edge of the Eromanga Basin, in the vicinity of the SA-NT border, included a geophysical and structural interpretation of available data, the drilling and...-
Document
Published: 23 Feb 1981
-
Venus Bay. Third partial surrender report, for the period 27/7/1994 to 26/1/1998.
Diamond and gold exploration undertaken on the two relinquished ground portions located north-west and east of Venus Bay on Eyre Peninsula, which total 530 square km in area, have comprised heavy mineral sampling, heavy mineral grain microprobing,...-
Document
-
Anna. Progress reports to licence expiry/full surrender, for the period 23/2/1977 to 22/2/1978.
Contains a SADME-written report on the November 1976 SA Government appraisal drilling of the Anna Coalfield (2 rotary mud/partly cored holes, total penetration 159.62 m, including 28.36 m of coring) to determine coal quality and verify thickness of...-
Document
-
Murray Basin stratigraphy. NSW. Palaeontological reports.
There is no abstract created for this record-
Document