-
The Musgrave Project [Part]. Data release in lieu of submitting a final report for EL 5317: joint annual reports for the period 5/10/2010 - 31/1/2016, plus separate letters of advice of full surrenders the last being accepted on 10/11/2016.
There is no abstract created for this record-
Document
Published: 06 Oct 1916
-
Data release [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles Nickel Project). Annual reports for the period 4/3/1999 to 23/9/2009.
A licence area located in South Australia's Far North-west Aboriginal Lands, and centred approximately 20 km to the south-east of the Surveyor Generals Corner at the borders of Western Australia, South Australia and the Northern Territory, has been...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles / Wingellina Nickel Project). Annual reports for the period 24/9/2009 to 23/9/2018.
Field work performed on the subject tenement during licence Year 8 included the conduct of Aboriginal heritage clearance surveys by the APY Traditional Owners to grant access for geological mapping and the acquisition of a trial seismic survey, as...-
Document
Published: 23 Nov 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Claude Hills. Annual reports for the period 31/5/2006 to 19/6/2017.
An area comprising three adjacent but separate sub-blocks in the Mount Davies district of the central Musgrave Ranges within South Australia was taken up afresh by the Metals X Group, through its wholly owned subsidiary Austral Nickel Pty Ltd, because...-
Document
Published: 15 Aug 1917
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 1917
-
RB 2003/00020 MANN map sheet bedrock drilling program.
After two years of negotiation with traditional owners and the Anangu Pitjantjatjara Land Council, the Geological Survey Branch of PIRSA's Minerals, Petroleum and Energy Division (MPE) commenced stratigraphic drilling on the 15th May 2002, in the...-
Document
Published: 01 Dec 2003
-
RB 2006/00005 The Southern Australian Archaean-Proterozoic Synthesis: Developing tectonic frameworks to assist mineral exploration. Abstract volume.
Includes abstracts with the following titles: 1) How magnetotellurics (MT) works, and an overview of new central Australian MT results (Kate Selway) 2) Latest MT traverse results: western Gawler Craton (Stephan Thiel) 3) A constrained 3D...-
Document
Published: 01 Feb 2006
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
RB 2013/00011 Geology of the Tieyon 1:100 000 map sheet (5645).
The Tieyon 1:100 000 mapsheet area is located on the South Australia – Northern Territory border in the central Far North of South Australia. It covers rock units of the Mesoproterozoic Musgrave Province, the Mesozoic Eromanga Basin and the Neogene...-
Document
Published: 01 Apr 2013
-
RB 2013/00006 SHRIMP U-Pb geochronology of the Tieyon (5645) 1:100 000 mapsheet.
This report presents SHRIMP U-Pb zircon geochronology results for 21 samples from the Musgrave Province, South Australia, acquired over the period 2007-2012 as part of the Tieyon 1:100 000 mapsheet (5645) mapping program. Some of the work (done on all...-
Document
Published: 01 Jun 2013
-
Musgrave Province, including APY Lands, Mineral Potential Modelling Data Package.
The purpose of this data package is to provide end-users with the GIS datasets and geophysical raster grids used for the 2010 modelling of mineral potential in the Musgrave Province region, which includes the APY (Anangu Pitjantjatjara -...-
Model
- ZIP,
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017