-
Hanging Knoll. Annual reports to licence expiry/full surrender, for the period 20/10/1995 to 6/9/2003.
Mafic and ultramafic rocks of the Proterozoic Giles Complex, which have intruded highly metamorphosed basement units of the Musgrave Block in an area 300 km WNW of Marla, were considered to have potential to host massive Ni sulphide mineralisation,...-
Document
Published: 02 Apr 2003
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 2 of 2 - a very long abstract is split between these two parts].
Abstract (Continued from Part 1): Because of the presence of the highest gold concentration at the eastern end of the Target 14 aircore drill traverse, potential remains for delineating further mineralisation at this locality. In addition, the...-
Document
Published: 10 Jan 2007
-
EL 6458 6783 Joint Annual Technical Report to period ending 08/11/2024
This report represents the Final Technical Report for EL 6458 and EL 6783. Originally Tri-Star was targeting coal resources within the Anderson Range Project. This focus shifted in 2021 to uranium conducive to insitu leaching, as well as metalliferous...-
Document
Published: 22 Nov 2024
-
East Deering Hills. Annual reports to licence surrender for the period 27/4/1994 to 25/9/2003.
Mafic and ultramafic rocks of the Proterozoic Giles Complex, which have intruded highly metamorphosed basement units of the Musgrave Block in an area 360 km WNW of Marla, were considered to have potential to host massive Ni sulphide mineralisation,...-
Document
Published: 02 Apr 2003
-
Data release - as updated : Mount Irwin (part of the Alcurra Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2021.
An area in the eastern Mugrave Ranges centred ~75 km south-east of Kulgera is being explored for possible buried economic magmatic Ni-Cu-PGE mineralisation hosted by inferred Proterozoic Giles Complex layered ultramafic intrusions, and also for...-
Document
Published: 22 Jul 2021
-
EL 6783 Annual Technical Report to period ending 23/05/2023
Tri-Star Minerals Pty Ltd (Tri-Star) Annual Technical Report for Exploration Licence (EL) 6783, provides a summary of the activities undertaken on the tenement for the reporting period ending 23 May 2023. EL 6783 is located near the Tieyon area,...-
Document
Published: 27 May 2025