-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
ExpNotes GILES: Explanatory Notes GILES
Concealed basement on GILES comprises ?Archaean to Palaeoproterozoic metamorphic rocks belonging to the Nawa Subdomain of the Gawler Craton. These are intruded by Mesoproterozoic Hiltaba Suite granitic bodies and Mesoproterozoic or Neoproterozoic...-
Document
-
RB 75/00002 Notes on the TARCOOLA 1:250 000 preliminary geological map.
There is no abstract created for this record-
Document
Published: 09 Jan 1975
-
Data release [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 26/8/2002 to 25/8/2009.
Exploration licence 3001 “Mount Yerila” is situated in the northern Flinders Ranges in the Moolawatana area, approximately 140 km east of Marree. The target commodity sought by Quasar Resources is uranium mineralisation in Tertiary sands and...-
Document
Published: 20 Nov 1909
-
RB 2009/00001 Explanatory Notes for [the] CALLABONNA 1:250 000 Geological Map, sheet SH 54-6.
The CALLABONNA map area includes the southern end of the Strzelecki Desert and the north- eastern Flinders Ranges, between latitudes 29° to 30° S and longitudes 139° 30' to 141° E. Cameron Corner adjoins New South Wales and Queensland in the...-
Document
Published: 01 Oct 2009
-
Bopeechee and Cadnia Hill/Stuart Creek and Porter Hill (The Lake Torrens Project). Data release made at two licences' surrender/two latter licences' fifth partial relinquishment: annual reports and final reports for the period 9/4/1998 to 31/12/2006.
The reports comprising this data release package describe exploration for economic deposits of base and precious metals that have possibly formed within Neoproterozoic metasediments, the underlying Palaeoproterozoic basement, and in Cambrian carbonate...-
Document
Published: 29 Sep 1909
-
Regolith map of the greater Tarcoola area of the central Gawler [Craton] region.
With the dawning of renewed interest in one of South Australia’s historic gold provinces, driven by the newly acquired data from the Department’s highly successful Gawler Craton Airborne Survey (GCAS), the Geological Survey of South Australia has...-
Map
Published: 01 Apr 2020
- ZIP
-
Mount Woods. Combined first progress/final report at licence full surrender, for the period 6/9/1979 to 5/12/1979.
Following an evaluation of existing subsurface data, 9 vertical percussion holes totalling 670 m were drilled to test discrete gravity anomalies in the Mount Woods area, in a search for Olympic Dam type mineralisation. The holes encountered...-
Document