Andamooka, Stuart Creek, Arcoona, Lake Torrens, Todds Dam, Lake Arthur, Woodforde Hill and Murdie Island (the Stuart Shelf Project). Joint first partial surrender report at licences' expiry/renewal, for the period 2/5/1975 to 16/6/1986.
WMC's Stuart Shelf exploration activities from 1975 to 1985 have sought mainly Olympic Dam style mineralisation (copper - uranium - precious metals in haematitic breccia host rocks), with lesser emphasis directed at: possible distal analogues of the...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-31 - Bute township area mineral prospect. Project interim and final reports.
The licensee, Peter Forwood, has been involved in mineral exploration at Bute for many years, initially with North Broken Hill Ltd in ELs 248, 420, 577 and 972, and has pursued the exploration of the area through many phases. Two important features...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 7/4/1975 to 6/4/1977.
Ongoing exploration for a possible Cattlegrid type stratabound copper deposit over an area south-west of Lake Torrens included aerial magnetic and EM surveys, drill testing of EM anomalies by 47 percussion holes totalling 2086 m, a regional magnetic...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Mount Gunson (part of the Mount Gunson Project). Third partial surrender report, for the period 16/6/1994 to 22/9/2010.
No work has been undertaken recently on the currently relinquished portion of EL 4460. However, previously this piece of ground, located between Lake Dutton and the southern end of Pernatty Lagoon, has formed part of three successive licences held...-
Document
-
Port Pirie. Progress reports to licence expiry/renewal, for the period 20/4/1977 to 19/4/1979.
Concerted exploration for possible stratiform Mount Gunson type or epithermal Olympic Dam type base metal deposits, on the south-eastern edge of the Stuart Shelf near Port Pirie, was begun by North Broken Hill Ltd in response to the public release by...-
Document