Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
Mount Willoughby. Annual reports to licence expiry/full surrender for the period 11/1/2001 to 10/1/2005.
Exploration for opal, carried out in an area of the Stuart Range located approximately 130 km north-northwest of Coober Pedy, has included a compilation of geological and opal occurrence data, photogeological interpretation of aerial photographs,...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
Report on preliminary feasibility study of use and mining of coal from deposits in an area near Lake Phillipson, South Australia.
Exploration drilling by Utah Development Co. during 1973 and 1974 in the area covered by EL 125 has outlined at least 2,000 million tonnes of medium quality steaming coal, of a quality considered to be comparable to that for coal from ETSA's Leigh...-
Document
-
[Results of in-house] Bench scale epsomite testwork.
Results of a programme of laboratory scale testwork conducted to investigate fresh water leaching of epsomite ore originating from Coober Pedy in South Australia are as follows: 1). The ore when leached readily producing brines of uniform...-
Document
Published: 16 Apr 1986
-
The Curnamona North Project. Joint annual reports and joint final report to the majority of licences' joint full surrender, for the period 16/7/2007 to 29/10/2015. EL 5322 final report to 15/7/2017.
A large, 3370 square km area of the Strzelecki Desert lying over and to the south-east of Lake Callabonna, and extending as far as the SA-NSW State Border, is being explored for possible economic buried sedimentary uranium mineralisation thought to...-
Document
-
Coober Pedy. Annual reports to licence expiry/full surrender, for the period 1/11/2016 to 31/10/2019.
A large area situated on the north-eastern side of the Stuart Range, comprising three separate sub-blocks that taken together are centred ~20 km north of Coober Pedy township, has been explored for possible economic near-surface accumulations of the...-
Document
-
Coober Pedy. First partial surrender report, for the period 1/11/2016 to 31/10/2018.
An area located immediately east and north-east of Coober Pedy is being explored for possible economic near-surface accumulations of the evaporite industrial mineral epsomite. Historic drilling and costeaning in this area performed by CRA Exploration...-
Document
-
Wintinna Coalfield hydrogeological and geotechnical study.
This study has formulated a geotechnical and hydrogeological model of the Wintinna Coalfield which satisfies the following objectives: - to provide answers to the hydrogeological and geotechnical questions raised by Fluor in their mining study; - to...-
Document
Published: 05 Dec 1983
-
RB 2001/00009 Downhole environmental risks associated with drilling and well completion practices in the Cooper/Eromanga Basins.
This project reviewed literature in order to: - evaluate any downhole environmental risks associated with drilling fluids and completion practices in the Cooper and Eromanga Basins; and - assess the effectiveness of cementing practices in achieving...-
Document
Published: 01 Mar 2001
-
Robin Rise. First partial surrender report, for the period 2/1/1997 to 1/1/2001.
A regional drilling programme was undertaken to investigate the economic potential of possible Permian coal occurrences within buried extensions to the Lake Phillipson Trough, in its adjacent northern Penrhyn Trough and south-eastern Ingomar regions...-
Document
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document
-
Wingilpin Bluff. First annual / final report to licence surrender for the period 27/3/2003 to 16/12/2003.
Evaluations of 3.5 m resolution digital elevation models lately acquired over the Wingilpin Bluff area, located 75 km north-east of Kingoonya, have indicated that substantial Tertiary and Recent erosion has removed most of the potential opal-bearing...-
Document
-
Preliminary mine planning and costing study, Wintinna Coal Deposit.
The 2000 Mt Wintinna coal deposit is located approximately 700 km north-northwest of Port Augusta in South Australia. The area has opencut potential, and is proposed for development to supply a thermal power station. Meekatharra Minerals Ltd holds...-
Document
-
White Hill. Combined first annual/final report to licence full surrender, for the period 19/7/2002 to 9/12/2004.
Reconnaissance geological mapping of existing, previously quite productive opal workings in the White Hill area of the Stuart Range 'Breakaway' country, 100 km south-east of Coober Pedy, was followed by exploratory and infill narrow-hole auger deep...-
Document
-
RB 2010/00002 GOMA basement drilling program, northern Gawler Craton.
The GOMA basement drilling program was named after the Gawler-Officer-Musgrave-Amadeus deep seismic reflection survey line, that was completed in 2008 by Geoscience Australia (GA) as part of its Onshore Energy Security Program. Funding for the seismic...-
Document
Published: 01 Feb 2010
-
Data release - as updated : Nicholson Hill and Welbourn Hill. Joint annual reports plus separate final reports to respective licence's expiry/full surrender, for the period 15/1/2008 to 14/1/2017.
Possible buried Proterozoic IOCG-U deposits that may have formed in two small licence areas located ~50 to 65 km east of Marla were the targets of renewed exploration, based on a re-interpretation of existing regional geophysical data. It had been...-
Document
Published: 13 Feb 2017
-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 2019
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 2010