-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-22, Lake Gilles - Corunna North area (north-western margin of Spencer Domain) IOCG mineral prospects. Project final report.
Potential Carrapateena or Prominent Hill style IOCG targets represented by newly recognised gravity anomalies in the eastern Lake Gilles area were the reason for a PACE Initiative Year 4 drilling funds proposal submitted to PIRSA by InterMet...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Tumby Bay. Progress and annual reports to licence surrender, for the period 16/1/1980 to 28/12/1982.
TARGET: Epithermal and unconformity - type uranium in Archaean to Early Proterozoic rocks of the southern Gawler Craton. EXPLORATION: - an aerial magnetic and radioactivity survey flown at 800 m, 1600 m and 400m spacing by Austirex in November 1979;...-
Document
Published: 21 Feb 1983
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
RB 2022/00007 40Ar/39Ar geochronology from AuScope National Argon Map samples, Gawler Craton, South Australia.
The National Argon Map was an AuScope-funded pilot project (2020–2021). The project aimed to compile a national-scale map of and to analyse new samples to fill the gaps in national coverage in 40Ar/39Ar geochronology. This report provides the results...-
Document
Published: 01 Jul 2022
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-07 - Intercept Hill JV Project, central Stuart Shelf area - Oak Dam South Proterozoic basement IOCG mineral prospects. Drilling project final report.
The Intercept Hill Project area is located in the central part of the Stuart Shelf. Gawler Craton basement rocks in the project area comprise leucocratic granite of the Hiltaba Suite, volcanic rocks of the Gawler Range Volcanics and metasediments of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-03 - Acropolis South area, eastern Stuart Shelf - Aphrodite IOCG mineral prospect. Project final report.
Over the past two years, Minotaur Exploration has identified and begun to explore a large new IOCG geophysical target (Aphrodite) that is located on EL 3762, and lies ~35 km SE of Olympic Dam. The target is a gravity-only anomaly with no discernible...-
Document
-
RB 2013/00014 IOCG-style mineralisation in the central eastern Gawler Craton, SA; characterisation of alteration, geochemical associations and exploration vectors.
While South Australia is well known as having within its borders major iron oxide - associated copper-gold (IOCG) deposits such as Olympic Dam, Prominent Hill, Carrapateena and Hillside, there has until now been a lack of publically accessible...-
Document
Published: 01 Oct 2013
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-02, Carrapateena mineral prospect. Project final report.
PACE Initiative Year 2 funding, to assist with drilling two deep holes on the Carra-east anomaly located near Salt Creek, 8 km west of where the Carrapateena Arm southern shoreline meets central Lake Torrens, was granted to RMG Services in May 2005....-
Document
-
Gawler Province regional geology 3D Model (3D version 1).
The Gawler Province 3D Geological Model is the second product of PIRSA's early 3D modelling trials conducted using 3D GeoModeller software. The work began with identifying the statigraphic units that were to be modelled. Due to the regional scale of...-
Model
- ZIP,
-
Emmie Bluff IOCG Mineral System 3D Model (3D pdf version).
The eastern Gawler Craton hosts the giant Olympic Dam iron oxide - associated copper-gold (IOCG) deposit, as well as several other world class IOCG deposits (i.e. Prominent Hill and Carrapateena). The region is covered by a thick sequence of...-
Model
- PDF,
- ZIP
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-34, Stuart Shelf, southern Carrapateena Project area, Horse Latitude IOCG mineral prospect. Project final report.
As part of the PACE Initiative Year 4 drilling project subsidy approvals, Teck Cominco was granted funding towards drilling one hole on the Horse Latitude target located approximately 22 km south-southwest of the Carrapateena prospect, an established...-
Document
Published: 24 Sep 2007
-
Mount Gunson and Mount Moseley (part of the Mount Gunson JV Project). Partial surrender reports, for the overall tenure period 15/7/1994 to 25/5/2021.
No exploration work has been undertaken on either of the recently relinquished portions of the two subject licences. Within the JV project tenements, exploration targets being addressed are: (1) possible economic buried IOCG (iron oxide-associated...-
Document
Published: 17 Oct 2018
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty Lagoon. Annual reports for the period 27/6/2007 to 22/7/2018.
Continuing exploration for possible buried economic IOCG mineralisation on the western side of an area located between Lake Torrens and Pernatty Lagoon, under tenure of renewed EL 3854, was focussed on determining mineral systems geochemical...-
Document
Published: 23 Aug 2018
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 2019