Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
Antechamber Bay. Progress reports and technical reports to licence expiry/full surrender, for the period 27/11/1986 to 26/11/1989.
TARGET: Evaluation of the gemstone tourmaline and kaolin clay potential of the Dudley Pegmatite on Kangaroo Island. It is believed that this known occurrence of coloured tourmaline is one of only two locations in Australia which have produced...-
Document
Published: 01 Jan 1989
-
Kyancutta. Progress and final reports to licence expiry for the period 6/9/1985 to 5/9/1986.
Marketable quality gypsum was the major commodity sought in Recent salt lakes and marginal dunes of a large swamp in the Kyancutta area. Reconnaissance mapping, plus hand or power auger drill sampling of the near-surface sediments, has identified...-
Document
-
RB 2020/00001 Mintabie opal resource evaluation: current value of opal resources and projected value of undiscovered resources (second edition, 2020).
The Mintabie Precious Stones Field (MPSF) has, since the early 1920s, produced some of the finest quality opal in the world. This report provides a review for understanding the remaining opal resources likely to exist there. A detailed spatial...-
Document
Published: 01 Jan 2020
-
Mount Crawford [clay deposits]. Progress reports to licence expiry/full surrender for the period 1/3/1970 to 31/8/1970.
Further evaluation of the development potential and marketability of white clay deposits found in the Mount Crawford area, that contain around 12 million tonnes of quartz-kaolin material, has been conducted by a new interested party, Springton Clays,...-
Document
-
Mineral Resource Potential Map Series - Noarlunga.
There is no abstract created for this record-
Map
Published: 01 Jun 1915
-
Mineral Resource Potential Map Series - Willunga.
There is no abstract created for this record-
Map
Published: 01 Jun 1915
-
RB 2008/00016 Review of the Burra Mine Project, 1980-2008 - a progress report.
The Burra (Burra) Mine, situated 150 km north of Adelaide within the Adelaide Geosyncline, produced 2.7 million tonnes of copper ore in two major mining phases - 1845-1877 and 1970-1981. The first phase was initially progressed by underground...-
Document
Published: 01 Jan 2009