-
Manners Well. Combined first annual/final report to licence expiry/full surrender, for the period 2/10/2018 to 1/10/2019.
An intensely faulted and folded area centred ~65 km north-east of Parachilna, where extensive hydrothermal alteration is evident in the Neoproterozoic bedrock, and where considerable past small-scale surface mining activity has occurred, but where no...-
Document
-
Narrina. Combined first annual/final report to licence expiry/full surrender, for the period 2/10/2018 to 1/10/2019.
An intensely faulted and folded metasedimentary area centred ~50 km east-northeast of Blinman, where extensive hydrothermal alteration is evident in the Neoproterozoic bedrock, and where considerable past small-scale surface mining activity has...-
Document
-
Lake Torrens Areas 1 and 2, Lake Torrens South and Lake Torrens North (the Lake Torrens Brine Potash Project). First joint annual report plus final report to licences' joint full surrender, for the period 5/1/2015 to 16/6/2016.
Much of the eastern side of the very large, 5,745 square km saline playa Lake Torrens, which occupies one of the most arid parts of Australia, was taken under licence by a Northern Territory - based company with the intent of systematically sampling...-
Document
Published: 14 Jun 1916
-
Heartbreak Bore (part of Afmeco's Tarcoola Joint Venture Project). Progress reports and final report to licence expiry/full surrender, for the period 16/1/1980 to 15/1/1982.
Portions of regional airborne radiometric and magnetic surveys, plus a small part of the HW-IV seismic refraction traverse, and 20 line km of gravity and ground magnetic surveys, were undertaken by joint venture operator Afmeco as part of its Project...-
Document