Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Woocalla (part of the Mount Gunson Project). Annual reports and final report to licence expiry/renewal over a reduced area, for the period 4/8/1995 to 3/8/2000.
Stuart Metals took up EL 2099 covering ground in the Wirrappa - Lake Blyth - Bookaloo Siding area primarily to explore it for stratiform copper mineralisation of the various styles present in the Mount Gunson area. In addition, it was thought that the...-
Document
-
Mount Gunson, Woocalla, Bernard Hill, Mount Moseley and Emmie Bluff (the Mount Gunson Project). Respective second to fourth partial surrender reports, for the overall period 15/7/1994 to 12/10/2004.
No work has been undertaken on the currently relinquished portions of ELs 3112, 2639, 3008 and 3022. However, as an attachment to the current EL 3112 relinquishment report, all technical data for Stuart Metals' recent diamond drillhole MGD24 (to...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 7/4/1975 to 6/4/1977.
Ongoing exploration for a possible Cattlegrid type stratabound copper deposit over an area south-west of Lake Torrens included aerial magnetic and EM surveys, drill testing of EM anomalies by 47 percussion holes totalling 2086 m, a regional magnetic...-
Document
-
Salt Creek. Progress reports to licence expiry/renewal, for the period 13/9/1976 to 12/9/1978.
Possible buried stratabound copper mineralisation of Mount Gunson / Cattlegrid type was the target of exploration performed on an area of the Stuart Shelf located 60 km east of Woomera. After conducting detailed 1:12,000 and 1:16,000 scale geological...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 1918
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1975 to 19/7/1977.
As part of continuing brownfields exploration for extensions to known stratiform base metal mineralisation in the area lying to the west of Pernatty Lagoon, much stratigraphic drilling (210 rotary percussion holes totalling 12,441 m, including 1167 m...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Ongoing appraisal work conducted by CSR at the company's newly discovered Cattlegrid copper deposit that lies at the top of the Pandurra Formation has included infill rotary percussion and diamond drilling (13 holes for 554 m, including 166 m cored),...-
Document
-
Stuart Shelf Project. EL 1338 first [and Project second overall] partial surrender report, for the period 2/5/1975 to 16/6/1991.
TARGET: Possible buried base and precious metal deposits associated with aeromagnetic anomalies, and also with either coincident or unrelated gravity anomalies, lying within a relinquished sector of the large contiguous multi-licence area that Western...-