-
Musgrave Province, including APY Lands, Mineral Potential Modelling Data Package.
The purpose of this data package is to provide end-users with the GIS datasets and geophysical raster grids used for the 2010 modelling of mineral potential in the Musgrave Province region, which includes the APY (Anangu Pitjantjatjara -...-
Model
- ZIP,
-
Northern Flinders Ranges Prospectivity Data Package.
The purpose of this data package is to provide end-users with the GIS datasets used for the 2009 modelling of mineral potential in the Northern Flinders Ranges. The package contains subsets of SA 1:100 000 scale surface geology (polygons) and...-
Dataset
- ZIP,
-
Ooldea South. Annual and final reports for the period 1/9/94 to 25/6/98.
Several potential diatreme-like circular targets up to 1 km in diameter were identified from an interpretation of regional and subsequently acquired infill aeromagnetic data over an area of the north-western Gawler Craton, 45 km south of Ooldea Siding...-
Document
-
Ifould West. Annual and final reports for the period 7/11/94 to 25/6/98.
Several potential diatreme-like circular targets up to 1 km in diameter were identified from an interpretation of regional and subsequently acquired infill aeromagnetic data over an area of the north-western Gawler Craton, 55 km south of Ooldea Siding...-
Document
-
Blue Dam. Final report to licence surrender for the period 24/3/94 to 23/9/96.
Anomalous gold and base metal geochemistry, detected in the early 1970s at a sample site between Lakes Everard and Gairdner, which lies in the vicinity of the contact between two Gawler Range Volcanics stratigraphic units, has not been further...-
Document
-
Anabama [Copper-Molybdenum Project]. Progress and final reports to licence expiry/renewal, for the period 26/10/1972 to 25/10/1974.
Ongoing exploration by the SA Department of Mines of the copper and molybdenum - mineralised Anabama Granite batholith, which is located 20 km south-east of Manna Hill, has involved detailed geological mapping, soil and rock chip sampling, and the...-
Document
-
RB 2016/00037 Vectorisation of residual gravity and TMI data in the northern Gawler Craton: implications for exploration targeting and GIS analysis.
Gravity and reduced-to-pole total magnetic intensity grids over the northern Gawler Craton have been vectorised, generating polygon datasets representing regions of locally anomalous gravity and magnetic intensity. Statistics from potential field...-
Document
Published: 01 Jul 2018
- PDF,
- ZIP
-
ExpNotes OOLDEA: Explanatory Notes OOLDEA
There is no abstract created for this record-
Document
-
ExpNotes STREAKY BAY: Explanatory Notes STREAKY BAY
There is no abstract created for this record-
Document
-
ExpNotes LINCOLN: Explanatory Notes LINCOLN
The LINCOLN 1:250,000 scale regional geological map area covers southern Eyre Peninsula and includes numerous islands lying off its eastern, southern and western coasts. The region encompasses a complex geological history and contains a variety of...-
Document
-
ExpNotes YARDEA: Explanatory Notes YARDEA
The YARDEA 1:250,000 scale regional geological map area straddles the southern margin of the Gawler Ranges on northern Eyre Peninsula. The only major township within the area is Minnipa, with Kimba and Wudinna both located immediately south of the...-
Document
-
EL 6388 6389 6390 Joint Annual Technical Report to period ending 21/08/2021
During the second year of reporting on the Marree Project, technical work was again limited to brief desktop reviews due to the global outbreak of the SARS-CoV-2 Coronavirus disease (COVID-19) and subsequent inter-state travel restrictions. The...-
Document
Published: 19 Oct 2021
-
EL 6388 6389 6390 Joint Annual Technical Report to period ending 21/08/2020
This is the first combined annual technical report for the Marree Project (EL 6388, EL 6389 and EL 6399) for the period 22nd August to 2019 to 21st August 2020. The project are is located approximately 280 km north of Port Augusta and 25 km northwest...-
Document
Published: 30 Sep 2020
-
EL 6388 6389 6390 Joint Annual Technical Report to period ending 21/08/2022
During the third year of joint reporting on the Marree Project, no on ground activities were undertaken, with exploration activities restricted to brief desktop reviews. The company continued to seek a Native Title Mining Agreement (NTMA) with the...-
Document
Published: 23 Sep 2022
-
EL 6603 Annual Technical Report to period ending 10/06/2022
Exploration Licence 6603 is located in the Yellabina area, approximately 130 km northwest of Ceduna, and comprises an area of approximately 899 square kilometres. The tenement sits geologically within the Fowler Domain and is considered prospective...-
Document
Published: 11 Aug 2022
-
EL 6603 Annual Technical Report to period ending 10/06/2023
No on-ground technical work was undertaken on this tenement during this 12-month period to 10/06/2023, as such a "no work letter" was submitted in lieu of an annual technical report for EL 6603.-
Document
Published: 14 Aug 2023
-
EL 6604 Surrender Report to period ending 10/06/2024
During the reporting period to 10/06/2024, exploration activities completed by the company included a literature review, historic drill core sampling, a review of available geophysical data and a gravity survey. During the literature review company...-
Dataset
Published: 10 Jun 2024
- ZIP,
-
EL 6603 Surrender Report to period ending 10/06/2024
During the reporting period to 10/06/2024, exploration activities completed by the company included a literature review, historic drill core sampling, a review of available geophysical data and a gravity survey. During the literature review company...-
Dataset
Published: 30 Jun 2024
- ZIP,
-
EL 6604 Annual Technical Report to period ending 10/06/2022
Exploration Licence 6604 is located in the Yellabina area, approximately 120 km northwest of Ceduna, and comprises an area of approximately 979 square kilometres. Geologically the tenement sits within the Fowler Domain in the western Gawler Craton and...-
Document
Published: 11 Aug 2022
-
EL 6604 Annual Technical Report to period ending 10/06/2023
No on-ground technical work was undertaken on this tenement during this 12-month period to 10/06/2023, as such a "No work letter" was submitted in lieu of an annual technical report.-
Document
Published: 14 Aug 2023