-
Wilcherry Hill. Data release made in lieu of submitting a first partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 8/9/1980 to 15/4/2003.
[incomplete : to be continued when time permits] - The Wilcherry Hill licence area was originally taken up in September 1980 by the Shell Company as EL 719, forming part of a larger regional mineral exploration tenement package on northern and...-
Document
Published: 14 Dec 1905
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 1918
-
Bull 033 The Geology and Iron Ore Resources of the Middleback Range Area
This report deals comprehensively with the physiography, prospect geology, and ore genesis, and includes an assessment of the iron ore reserves and other mineral resources of an area which has been almost the sole source of the iron ore used in...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 1908
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release at the third renewal / partial relinquishment of the latter licence : progress and annual reports for the period 14/2/1989 to 30/8/2003. [Index Part 2 of 2].
Abstract continued : During January-February 1993, five traverses spaced 800 m apart of RAB drillholes put in 50 m apart (57 vertical holes for a total penetration of 2688 m) were completed at Death Adder prospect by Aberfoyle Resources to appraise...-
Document
Published: 16 Oct 1903