RB 77/00009 Construction materials investigation Redcliff petrochemical site, sections 12, 18, 99, 100, 101, 102, 103, 104, 102, 134 Hd Winninowie, Co. Frome.
Materials suitable for concrete aggregate, railway ballast, road base course, protection of salt field sea wails and rock fill will be required should construction of the petrochemical plant and appurtenant works proceed at Redcliff, 25 km...-
Document
Published: 01 Jan 1977
-
RB 00811 Redcliff Project: geological setting and preliminary assessment of environmental factors.
This report has been compiled at the request of the Redcliff Steering Committee to assist in the preparation of an Environmental Impact Statement. It relies almost entirely on work carried out by Departmental officers and private consultants during...-
Document
-
RB 74/00211 Redcliff petrochemical plant jetty site. Report on foundation investigation - Department of Marine and Harbours.
Eight cable-tool holes have been completed as part of a program of drilling on the site of the proposed jetty for the Redcliffs Petrochemical Plant. Drilling has revealed a variable succession of unconsolidated sediments. The Marine sands are loose,...-
Document
Published: 01 Jan 1974
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
Absorbent Clay Project. Progress reports for the period January 1994 to January 1996.
This project was designed to determine the potential of various clays to absorb harmful or toxic substances present in water intended for human use. The clay samples that were selected for study contain significant amounts of either smectite, kaolin,...-
Document