-
Moorlands. Progress reports and final report to licence expiry/renewal, for the period 10/9/1976 to 9/9/1978.
Work consisted of gathering all available information and advice on, and assessing the problems associated with, treatment of the Moorlands deposit low rank brown coal to make it a fuel suitable for use in cement manufacture within a newly constructed...-
Document
-
Hydrogeological report on water well monitoring in Aboriginal Lands - April to October 2000.
Water well monitoring data from wells on Aboriginal lands (Pitjantjatjara, Yalata and Nepabunna) are summarised for the period April to October 2000. Equipment failure was high, with faults recorded at 17 wells, particularly of the 2100P standing...-
Document
-
Amdel Ltd project - Fluid inclusion studies of South Australian ores, rocks and minerals. Progress reports nos 1 to 6 for the period 7/5/1976 to 3/4/1980.
In September 1975 the South Australian Department of Mines accepted a proposal from Amdel Ltd to purchase and set up some microthermometry apparatus, in order to commence fluid inclusion studies of selected rock types and minerals in South Australia....-
Document
-
Adelaide Seismic Zoning Study : progress reports on determination of earthquake seismic hazard zones for the Adelaide area.
Earthquake records for ten recent natural seismic events regarded as typical of what has already occurred or could occur in the future within or close to the Adelaide area have been analysed by contract civil engineers to determine the dynamic...-
Document
-
SADME/Amdel mineral research project : Leigh Creek Coalfield - coal petrology investigations. Progress reports for the period April 1979 to June 1980.
Coal samples collected by the SADME Fossil Fuels Div. from the Leigh Creek Coalfield during its recent drilling programme have been examined and analysed according to preset parameters to allow comparison of average coal quality between this field and...-
Document
Published: 04 Jul 1980
-
History of mineral processing in South Australia - Ammonia leaching of oxide copper ores by Samin Limited at Burra, SA.
When Samin Ltd decided in 1969 to re-open the Burra mine for open pit extraction and onsite processing of the substantial remnant orebody of oxidised copper minerals, it was initially envisaged that the copper recovery method would involve an acid...-
Document
-
Report of a working party formed to address public risk safety issues arising from the presence of abandoned quarries on Mitcham Council land.
On 25 June, 1998, in response to the matter of safety in Mitcham district quarries being raised in that area's Council proceedings, a working party was formed to address the safety issue of all quarries on Council land. The working party comprised:...-
Document
Published: 01 Jan 1999
-
Gulf Saint Vincent. Progress reports to licence expiry/full surrender, for the period 23/7/1976 to 22/7/1978.
During a dredging trial conducted by the licensee in the Gulf on 9-10/11/1976, using the dredging vessel "Andrew Wilson" owned by the SA Board of Marine and Harbours, some 200 tonnes of shell were recovered from the open seabed in seven locations...-
Document
Published: 22 May 1978
-
Response to the [FEAC] Coal Review Group draft comments [on the] proposal to the Government of South Australia for the utilisation of the Wintinna Coal Deposit.
This document elaborates on two main points of difference, and the validity of certain criticisms of technical data and cost estimate derivations, present in the original 1984 submission to the South Australian Government on the proposed open cut...-
Document
-
RB 60/00056 Kangaroo Creek Dam. Status of geological investigations as at March 16th 1965.
There is no abstract created for this record-
Document
Published: 01 Jan 1965
-
RB 64/00086 Report on the geology of the Kangaroo Creek Dam.
The site for the Kangaroo Creek Dam is on the Torrens River, 14 miles northeast of Adelaide. The dam is to provide 250 000 acre feet of storage for the Adelaide metropolitan water supply system. A diversion tunnel in the right bank, constructed during...-
Document
Published: 01 Jan 1967
-
Tintinara. Progress reports and final report to licence expiry/full surrender, for the period 8/1/1979 to 7/1/1980.
Exploration for possible economic Tertiary lignite and coal seams within sediments overlying the northern flank of the Padthaway Ridge palaeo-archipelago in the western Murray Basin has consisted of the drilling and geological/geophysical logging of 7...-
Document
-
Mount Arden. Progress and final reports to licence expiry/full surrender, for the period 1/9/1966 to 31/8/1967.
An area located approximately 12 miles north of Quorn was re-issued to Kennecott over a reduced licence acreage, to permit further investigation of Cambrian Parachilna Formation and Wilkawillina Limestone strata which had shown anomalous copper, lead...-
Document
Published: 25 Sep 1967
-
Mount Fitton. Progress and technical reports for the period 1/7/1971 to 30/6/1973.
A review has been carried out by Amdel Ltd, under contract to the licensee, of the applicability and suitability of low-cost geophysical reconnaissance tools in prospecting for concealed talc occurrences in the Mount Fitton area. It appears that use...-
Document
Published: 13 Jun 1973
-
Burdunga Rock Hole. Progress reports and final report to licence expiry/full surrender, for the period 28/10/1975 to 19/11/1976.
TARGET: Permian coal in the Tallaringa Trough, east of Maralinga. EXPLORATION: An 11 hole RC drilling programme totalling 1480 m. RESULTS: Eight drillholes intersected up to 4 horizons of lignite and lignitic clay of demonstrated Eocene age, that...-
Document
-
HandBk 001 - Handbook on Quarrying (revised 5th edition). Dutton A.H. 1993 (reprinted version)
The aims of this handbook are to give practical guidelines to quarry operators and to discuss problems connected with operations which affect their employees and the general public: the handbook also points out obligations that arise out of...-
Document
-
Peesey Swamp, southern Yorke Peninsula. Progress reports for the period 1/5/1969 to 31/10/1970.
The enclosed reports describe geological, hydrological, geotechnical, market research, and plant design and trial construction work that has been carried out with a view to determining the feasibility of an integrated groundwater and seawater salt...-
Document
-
Salt damp research progress reports 1 to 10.
There is no abstract created for this record-
Document
Published: 01 Jan 1978
-
Lake Frome South. Progress reports to licence expiry/full surrender for the period 12/4/1979 to 11/4/1980.
Four samples of fresh attapulgite/palygorskite - bearing dolomitic claystone obtained from backhoe trenches dug into creek beds close to the south-eastern edge of Lake Frome were assessed for their clay material properties, in a search for absorptive...-
Document
-
Interim report on the completion of phase I of the Peesey Salt Project.
There is no abstract created for this record-
Document
Published: 01 Jan 1969