-
Archaean Metabasic Diamond Drilling Project.
The Archaean Metabasic Diamond Drilling Project was undertaken by SADME Regional Geology Branch (part of the Geological Survey of South Australia) in two locations within the north-western Gawler Craton. Metasediments in this region include banded...-
Document
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-40, Soyuz gold / copper-gold mineral prospect. Project final report.
Previous exploratory work by Grenfell Resources and Gravity Capital at the Soyuz prospect in the Carnding area, located approximately 25 km west-northwest of Tarcoola, has included ground magnetic, gravity and soil sampling programmes that defined a...-
Document
Published: 15 Jun 1906
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Tarcoola - Mount Finke area. Progress reports and annual reports plus final report to licence full surrender, for the period 1/6/1992 to 10/8/2002.
Buried Archaean Mulgathing Complex rocks, comprising metamafics, ultramafics, granites, mafic gneisses and possible greenstones, were the target host for gold, copper and nickel mineralisation in the Mount Finke - Malbooma area, south-west from...-
Document
Published: 26 Mar 1903
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 1/1/2015 to 31/12/2018.
During the fourth year of project licences' joint reporting, for the Theseus Project, Endeavour undertook further RC and diamond core drilling at the Minos prospect on EL 5280, and did detailed auger calcrete geochemical sampling over the Lake...-
Document
Published: 21 Feb 1919
-
Data release [made at SA Director of Mines’ discretion] : Carnding. Annual reports to licence expiry/renewal, for the period 5/7/2005 to 4/7/2009.
EL 3369 is located in the central Gawler Craton, and is centred approximately 35 km west and west-northwest of Tarcoola. The licence area consists of two geographically separate [by ~5 km] blocks – exploration activity in the eastern block has...-
Document
-
RB 2003/00017 Gawler Craton 2003. State of play - The Excursion.
Following on from the highly successful Gawler Craton - State of Play 2002 conference held by PIRSA in Adelaide in December 2002, the Gawler Craton Team of PIRSA's Geological Survey Branch has recently undertaken a major excursion across the craton....-
Document
Published: 01 Sep 2003
-
Lyons. Annual reports to licence expiry/full surrender, for the period 13/5/1996 to 12/5/2001.
Gold and base metal mineralisation hosted by Archaean gneisses of the Mulgathing Complex and Proterozoic Hiltaba Suite granites was the target of exploration in an area 100 km west of Tarcoola. Regional calcrete sampling on a nominal 1 km grid...-
Document
Published: 07 Aug 1900
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-10, Harris Greenstone Belt mineral prospects. Project interim and final reports.
In September and December 2004 Mithril Resources completed 53 vertical aircore and reverse circulation drillholes on Exploration Licence 2842 as part of the SA Government's PACE Initiative 'Theme 2' collaborative drilling programme involving PIRSA...-
Document
-
RB 2002/00011 Harris Greenstone Domain bedrock drilling, May-August 2001.
The Harris Greenstone Domain bedrock drilling program - Phase 1, carried out during May to August 2001, has determined depths to basement, the basement lithology, and has outlined areas of anomalous gold, nickel and chromium geochemistry within...-
Document
Published: 01 Jul 2002
-
Lake Labyrinth (part of the Gawler and the Labyrinth Joint Venture Projects). Data release at second partial relinquishment : project licences' combined annual reports for the period 27/8/1999 to 28/9/2008.
In a continuation of exploration for economic deposits of gold and base metal mineralisation in the Lake Labyrith area, joint venture operator MIM Exploration carried out a proprietary 'MIMDAS' geophysical survey (utilising combined dipole-dipole IP...-
Document
Published: 18 Mar 1909
-
Talia Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/9/2001 to 25/6/2009.
During the late 1990s, company exploratory drilling of the Harris Greenstone Belt in the central Gawler Craton, south of Tarcoola, revealed a package of previously unknown, shallowly buried komatiite lava beds with a strike length in excess of 350 km...-
Document