PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-10, Harris Greenstone Belt mineral prospects. Project interim and final reports.
Downloads
Name | Description | Download | Select |
---|---|---|---|
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-10, Harris Greenstone Belt mineral prospects. Project interim and final reports. |
About this record
Record No | mesac20933 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | Mineral Company Report - Mineral Exploration |
Contributor | Pontifex and Associates Pty Ltd |
Sponsor | Mithril Resources Ltd |
Tenement | EL 2842 |
Tenement Holder | Minex (Aust.) Pty Ltd |
Operator | Mithril Resources Ltd |
Geological Province | |
Mine Name | Mullina prospect;Mullina West prospect;Moolkra prospect |
Stratigraphy | |
Commodity | nickel |
Notes |
Notes: PACE project code DPY1-10 : company interim submission includes exploration drilling actual total cost ($60,213.72 excluding Goods and Services Tax), out of which PACE Initiative funds have paid 50% or $30,106.86 (excl. GST). Geographic...
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac20933 |
Citation | Hill, P.W.;McKinnon-Matthews, J.;Purvis, A.C. PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-10, Harris Greenstone Belt mineral prospects. Project interim and final reports. Mineral Company Report - Mineral Exploration https://pid.sarig.sa.gov.au/document/mesac20933 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[133.701368,-30.998557],[134.868021,-30.998557],[134.868021,-30.798544],[133.701368,-30.798544],[133.701368,-30.998557]]]} |
Purpose | |
Lineage |