-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Data release - as updated : Brooker (part of the Brimpton Lake Project). Annual reports to licence expiry/full surrender, for the period 12/6/2003 to 24/8/2018.
Exploration Licence 3096 “Brooker” covering an area of 682 square km lies east of Elliston on the Eyre Peninsula in South Australia. It is one of three adjacent tenements that form the “Brimpton Lake Project”; the other two are EL 2662 (initially...-
Document
-
Jubilee Dams. Final report at licence full surrender, for the period 11/8/1977 to 14/12/1977.
A programme of ground magnetic surveying along 7 short traverses, plus air/mud drag-bit percussion drilling (5 vertical open holes totalling 509 m) was used to investigate a set of previously untested discrete aeromagnetic high anomalies covered by...-
Document
Published: 02 Dec 1977
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 1918