Roopena Station. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 26/6/1985.
Exploration of an area situated between Whyalla, Iron Knob and The Bluff overlooking Myall Creek, 20 km south-west of Port Augusta, aimed to test for Olympic Dam - type Cu-U-Au mineralisation associated with products of igneous activity located in and...-
Document
Published: 09 Aug 1985
-
Continuous solvent extraction studies.
Work carried out at Amdel and at the Colorado School of Mines' Research Institute has indicated that both a two solvent system (EHPA and TBP or DBBP) and a three solvent system (EHPA, DBBP and Alamine 336) of cationic exchangers are satisfactory for...-
Document
-
RB 41/00035 Section of report on work conducted and plants visited during a twelve month period spent in Canada.
There is no abstract created for this record-
Document
Published: 01 Jan 1955
-
RB 51/00114;Amdel 00064 Retreatment of Radium Hill tailings dumps. Second report. Pilot plant tests.
A tailings dump of approximately 100 000 tons from earlier treatment exists at Radium Hill. A report of laboratory flotation tests on this material was issued in June, 1960, (AMDL 40). The laboratory work showed that recovery at the grade of 10.0 lb...-
Document
Published: 01 Jan 1960
-
RB 42/00081 Rubber lining investigation, Radium Hill Project, Port Pirie. Preliminary report.
At the request of the Radium Hill Project Committee a preliminary examination has been made of the deterioration of the rubber lining in sections of the Port Pirie Chemical Plant. Mr. D.C. Madigan a Senior Research Chemist of this branch visited the...-
Document
Published: 01 Jan 1956
-
RB 45/00027 Gamma radiation from drums of product loaded for transport.
Dose rates found along the side of a loaded truck and simulated semi-trailer did not exceed two millirontgens per hour; on top they reached 2.5 millirontgens per hour, but in the cabin all were below one millirontgen per hour.-
Document
Published: 01 Jan 1957
-
RB 86/00040 Olympic Dam. The first decade.
The discovery of copper mineralization by WMC on Roxby Downs station in July 1975 heralded 1 of the more intensive base metal exploration programmes undertaken in Australia. Comprehensive exploration, evaluation and feasibility studies between 1975...-
Document
Published: 01 Jun 1986
-
RB 79/00139 Honeymoon camp supply well. Discharge test results, EL 377, southern Frome Embayment.
Water supplies for the proposed camp for the Honeymoon mining operation will be obtained from groundwater, and a well has been completed in the upper Sand Unit aquifer. The capacity of the well is more than adequate for the anticipated camp/stock...-
Document
Published: 01 Jan 1979
-
RB 91/00085 Mineral occurrences of the KIMBA 1:250 000 map sheet area.
There is no abstract created for this record-
Document
Published: 01 Sep 1991
-
Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Soil and groundwater investigation, Beverley prospect, SML 564. Report on Stage I feasibility study.
The Stage 1 feasibility study carried out during February-May, 1973 has included regional groundwater studies, pumping tests, logging and laboratory tests on drill cores, slope stability analyses, preliminary design of pit slopes and dewatering...-
Document
Published: 31 May 1973
-
Preliminary [mining] feasibility study [for the] Lake Frome uranium orebodies. Final report.
Report presents the results of a preliminary study of the commercial feasibility of producing yellowcake from the Beverley sedimentary uranium deposit located near Lake Frome. All of the available drillhole data for this deposit was examined and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Ardrossan, Minlaton and Ardrossan coast areas (the Pine Point Project). Joint annual reports for the period 2/8/2008 to 1/8/2014.
Rex Mineral’s ('Rex') primary objective in the Pine Point Project area is to determine the potential for economic basement-hosted iron oxide - associated copper-gold mineralisation such as that found at Olympic Dam, Prominent Hill, Ernest Henry and...-
Document
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document
-
Olympic Dam operations. Wellfield A area. Production history and aquifer response for the period July, 1989 to June, 1990.
Data relating to work carried out, water production and aquifer response from the Wellfield A area in the Great Artesian Basin is presented.-
Document
Published: 01 Jan 1990
-
MR 005 Review of mining operations in the State of South Australia during the year ended June 30th, 1906
Articles and summaries are provided for the following: Copper: Wallaroo and Moonta, Paramatta and Yelta, Hamley, Burra Burra, Kapunda, Blinman, Mount Gunson (North-West), Prince Alfred Mines Gold: Kings Bluff. Mount Torrens, Peterborough, Tarcoola,...-
Document
-
RB 00434 Mount Victoria uranium deposit. Transport of ore to Radium Hill.
This report considers the possibility of transporting the ore mined at Mount Victoria to Radium Hill for metallurgical treatment. Mining would be at the same rate as considered in Report No. MN/I 19/24, that is, 100 tons per day, or 25,000 tons per...-
Document
Published: 01 Jul 1900