-
Nundroo (latterly part of the Eucla Basin Heavy Mineral Sands Project). Final report at licence expiry/full surrender, for the period 16/9/2014 to 15/9/2019.
An area comprising two separate blocks located ~20 km west and ~45 km north of Fowlers Bay has been explored for possible buried Pleistocene reworked heavy mineral sands (HM) marine placer mineralisation that may have become concentrated within the...-
Document
Published: 19 Sep 1919
-
Western Gawler Project. Final report, Magneto Telluric, Passive Seismic and Magnetic Modelling Study. Project ADI RD02-296 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises geophysical studies conducted by Western Areas between October 2021 and October 2022, under the ADI Agreement ADI: RD02/296-GP Magneto Telluric (MT), Passive Seismic and Magnetic Modelling Study. The discovery of magmatic Ni-Cu...-
Document
Published: 06 May 1923
-
Fig Tree Corner, Ooldea South, Barton, Colona North, Ooldea Range and Pidinga (the Eucla Basin HMS Project tenement Group One). Joint annual reports for the period 1/3/2011 to 31/12/2015.
During the 2011-2012 joint reporting year, Iluka undertook drilling on ELs 3638, 3742 and 4544 with three aims: to extend the Typhoon HM deposit resource, to follow-up results of brownfields drilling at the Sonoran prospect, and to do further infill...-
Document
Published: 28 Feb 1916
-
Novel technologies for [use in] mining and [earth resource] exploration: remote smart sensor deployment for in situ geophysical analysis. Final report, Project ADI RD01-123 [part of Accelerated Discovery Initiative Round 1, 2022].
Nine compact seismic motion recorders and nine co-located ground probe thermocouples have been deployed at various sites near the Carrapateena mine, to test the efficacy of making continuous remote data collection and the reliability of their...-
Document
Published: 27 Oct 1922
-
Honeymoon Uranium Project. Final report for approved seismic geophysical work programme, Project ADI RD01-100 [part of Accelerated Discovery Initiative Round 1, 2021].
Within two areas located north-west of Cockburn, Honeymoon Project licensee Boss Energy (Boss) is targeting possible sandstone-hosted uranium mineralisation in primarily palaeochannel-hosted, redox-controlled type occurrences, similar to the...-
Document
Published: 30 Nov 1921
-
Alford West. Final report, Project ADI RD03-386 [Accelerated Discovery Initiative Round 3, 2023].
“Defining Attributes for In-Situ Recoverable Cu Mineralisation by Geophysical Surveying” This Accelerated Discovery Initiative funded project sought to explore whether non invasive geophysical techniques can provide valuable insight into...-
Document
Published: 30 Jun 1923
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola, Moolawatana and Mount Hopeless (the Frome Basin Project). Joint annual report for the period 1/1/2016 to 31/12/2018.
Exploration Licence 5017 Arkaroola, Exploration Licence 5118 Mt Yerila and Exploration Licence 5261 Petermorra cover a combined area of approximately 1831 square km within the northern Flinders Ranges and the Frome Basin. The area is being targeted...-
Document
Published: 16 Jan 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
Seismic ambient noise tomography across southern Australia
The rocks of southern Australia record over three billion years of Earth's evolution, but the basement geology is veiled by sediment. Geophysical data are needed to unveil the geology. The 2018-2022 Lake Eyre Basin and 2020-2022 AusArray SA seismic...-
Dataset
- ZIP,