Stony Hill (part of the Northern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 2/12/2004 to 23/12/2016.
During the life of the subject licence, the focus of exploration was to determine the area's potential for DSO haematite iron ore, with a secondary consideration being magnetite and haematite BIF. After conducting geophysical surveys and exploratory...-
Document
Published: 17 Jan 2017
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 2008
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 2019
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 2003