-
RB 78/00041 Naracoorte planning study engineering geology investigations - B. Turner and Associates.
Naracoorte Corporation area straddles two northwesterly trending dune ridges and their corresponding flats. Cemented limestones of the Bridgewater Formation and Gambier Limestone, occasionally mantled by windblown sands, form the two ridges; younger...-
Document
Published: 01 Jan 1978
-
EPP 23, Otway Basin, South Australia. Evaluation report.
In order to examine the prospectivity of EPP 23, for which they assumed the operatorship by a 65% farm-in in August 1990, BHP Petroleum have examined well palynological and geochemical data in and around the permit and have interpreted over 600 km of...-
Document
-
Heathfield 1. Well completion report.
There is no abstract created for this record-
Document
Published: 01 Jan 1964
-
PEL 22 exploration guidelines and the prospects for locating hydrocarbons (in) the Gambier Embayment, South Australia.
This study concentrates on the correlation of lithostratigraphic units, establishing a model for the likely source rock maturity pattern, and elucidating the structure, seal and reservoir relationships. The Early Cretaceous Otway Group is considered...-
Document
-
Hydrocarbon potential of S87-1 application area, Otway Basin.
There is no abstract created for this record-
Document
-
1988 seismic survey, Gambier, final report.
AIM: The 1988 Gambier Seismic Survey of semi-detailed and regional data acquisition was shot principally to upgrade the prominent Glenburnie lead in the northeast of PEL 28 into a drillable prospect. This lead, identified 1n 1986 by the Burrungule...-
Document
-
1987 seismic survey, Orana, final report.
AIM: The 1987 Orana Seismic Survey, consisting of 14 lines with a total coverage of 55.6 line kms, was shot to further detail leads identified by the 1985 Burrungule Seismic Survey, other than the single lead (McNamara Prospect) which was confidently...-
Document
-
1986 seismic survey, Burrungule detail, operations report.
AIM: This seismic survey of 35 lines with a total coverage of 200.1 line kms was shot to further detail leads identified by the 1985 Burrungule Seismic Survey, and thereby attempt to upgrade at least two of them to drillable prospect status. The work...-
Document
-
1985 seismic survey, Burrungule, final report.
AIM: This seismic survey of 32 lines with a total 352.26 line kms coverage was conducted in the two most prospective areas of the licence in order to fulfil the Licence Year 1 work commitment of at least 250 line kms of seismic acquisition. The two...-
Document
-
Zema 1. Test reports.
Contains a report by the wireline logging contractor Schlumberger on the checkshot survey of the well used to calibrate the sonic log and generate synthetic seismograms, a separate pre-interpretation report by Schlumberger on MSD (mean square dip)...-
Document
Published: 31 Mar 1992
-
South-East SA [coal and oil shale] Project. Data release : relinquishment report at licences' joint partial surrenders, for the period 3/11/1978 to 15/12/1982.
In a rationalisation of its extensive exploration acreage formerly held in the upper South-east of South Australia for the purpose of coal exploration, Western Mining Corp. (WMC) has partially relinquished most of the ground that it previously held...-
Document
Published: 30 Mar 1983
-
Preliminary review of the Otway Basin.
There is no abstract created for this record-
Document
Published: 01 Jan 1966