Blue Gum Hill, Kangaroo Island. Progress and final reports to licence surrender for the period 19/4/1973 to 29/1/1974.
In ongoing exploration of the base metal potential of a small licence area located 34 km west of Kingscote, 5 inclined shallow diamond drillholes totalling 399 m were put down on significant anomalies located by IP surveys and/or geochemical soil...-
Document
Published: 29 Jan 1974
-
Rehabilitation of the Nairne Pyrites Ltd quarry area and treatment of acidic effluent. Progress and final reports on investigations for the period March 1973 to June 1975.
A chemical survey of Dawesley Creek in the Brukunga Mine area has concluded that seepages from the southern mine waste dumps located alongside the creek contribute the greater proportion of pollutants (acidity, iron, aluminium, manganese, zinc,...-
Document
-
RB 74/00222 Amdel 01015 Rehabilitation of Brukunga mine, Nairne Pyrites Ltd.
This investigation of the Brukunga mine site was prompted by the observed release of acid waters with high iron and other heavy metal concentrations into Dawesley Creek, the consequences of which could include possible pollution of Lake Alexandrina...-
Document
Published: 01 Nov 1974
-
RB 2000/00019 Dawesley Bremer Catchment, phase 2 sampling program for potential environmental contaminants.
A previous regional soil and stream sediment sampling program (cf. RB 2000/00002) has delineated areas of heavy metal contamination in the Dawesley-Bremer Catchment. Heavy metal contamination was found to occur sporadically along both Dawesley Creek...-
Document
Published: 01 May 2000
-
RB 2000/00002 Soil and stream sediment sampling of the Dawesley-Bremer Catchment for potential environmental contaminants.
A program of soil and stream sediment sampling was conducted along the Dawesley - Bremer Catchment to determine the extent and magnitude of potential heavy metal contamination downstream from the Brukunga Pyrite Mine. Arsenic, cadmium, copper and zinc...-
Document
Published: 01 Jan 2000