-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document
-
Data release - as updated : Castle Rock. Annual reports to licence full surrender, for the period 17/3/2009 to 14/1/2016.
Exploration for possible economic concealed Beltana mine type stratabound lead-zinc-(silver) mineralisation, and for other diapiric and associated basic igneous intrusion - related base metal and/or gold occurrences, was carried out over a small area...-
Document
Published: 20 Jan 1916
-
Geochemical mapping of a copper mineral system, Lyndhurst area (for the ARC North Project). Final report, Project ADI RD01-126 [part of Accelerated Discovery Initiative Round 1, 2021].
As a part of searching for economic deposits of sediment-hosted copper (SHC) mineralisation that might have formed within rocks of the Adelaide Rift Complex Neoproterozoic sedimentation sequence occupying an area located due east of Lyndhurst in the...-
Document
-
Ruby Hill Project : Douglas Creek prospect drilling program. Final report, Project ADI RD02-288 [part of Accelerated Discovery Initiative Round 2, 2022].
Copper Search Australia Pty Ltd (a subsidiary of Copper Search Limited) was granted co-funding from the Department of Energy and Mining in July 2021 to a subsidy total of up to $228,000, to assist it with high risk exploration of remote parts of the...-
Document
-
Merna Mora. Annual reports to licence expiry/full surrender, for the period 9/10/2006 to 8/10/2013.
A small licence area located on the Flinders Ranges piedmont plain south-east of Lake Torrens was taken up by Jim Allender to investigate the IOCG potential of a discrete regional gravity anomaly which he had identified from data in the public domain,...-
Document
Published: 20 Nov 1913
-
Mount Denison (part of the BHP Billiton - Rio Tinto - Phelps Dodge' Peake and Denison Joint Venture Project). First partial surrender report, for the period 12/7/1993 to 16/9/2003.
Exploration carried out over the northern Peake and Denison Ranges since 1993 has targeted possible large-scale Proterozoic iron oxide associated copper-gold (IOCG) deposits considered to have formed in stratigraphic/structural settings similar to...-
Document