-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Peake and Denison Ranges. Data release made at subsequent licences' expiry/full surrender : annual reports for the period 12/7/1993 to 11/7/1995.
An area covering most of the northern outcropping Peake and Denison Ranges basement inliers was taken up by Pancontinental Mining to test for possible economic occurrences of lead-zinc and copper-gold mineralisation (broadly matching Mount Isa Block,...-
Document
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
RB 2020/00002 Gawler Craton Airborne Geophysical Survey Region 2B, Warrina – Enhanced geophysical imagery and magnetic source depth models.
This report presents the results of a study by the Geological Survey of South Australia and CSIRO Mineral Resources to enhance the expression of geological structure in geophysical images and derive depth to magnetic sources over Region 2B of the...-
Document
Published: 01 Feb 2020
- ZIP,
-
Gawler Province regional geology 3D Model (3D version 1).
The Gawler Province 3D Geological Model is the second product of PIRSA's early 3D modelling trials conducted using 3D GeoModeller software. The work began with identifying the statigraphic units that were to be modelled. Due to the regional scale of...-
Model
- ZIP,
-
Mount Denison. Progress reports and final report to licence expiry/full surrender, for the period 19/11/1973 to 18/11/1974.
As part of a continuing search for possible Palaeoproterozoic unconformity and vein-related hydrothermal uranium deposits in the northern Peake and Denison Ranges basement outcrop region, prospective stratigraphic and structural features were mapped...-
Document
Published: 16 Jan 1975
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017