-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Aerial [INPUT] EM survey data interpretation and follow-up drilling results, Winnie Pinnie area, Stuart Shelf, for the period April 1976 to May 1979.
The results of 1185 line km of aerial EM surveying carried out in the vicinity of Winnie Pinnie Dam, 85 km north-west of Port Augusta, using the Barringer INPUT system, have been interpreted as a possible means of identifying prospective Adelaidean...-
Document
-
Lake Macfarlane - Lake Finniss area. Progress reports to licence expiry/full surrender, for the period 1/7/1967 to 31/12/1967.
Consultants were engaged by the licensee to conduct an extensive geological and geochemical investigation of a 2700 square mile area surrounding the Mount Gunson copper deposit, and to perform an interpretation of available regional aeromagnetic data....-
Document