-
Data release - as updated : One Tree Hill (part of the Manna Hill Project). Annual reports and final report to licence expiry/full surrender, for the period 5/11/2007 to 4/11/2017.
Exploration for possible economic vein-style and structurally controlled gold with Adelaidean bedrock sediments in an area located between the towns of Yunta and Manna Hill was conducted using low cost remote sensing, geochemical and geophysical...-
Document
Published: 15 Dec 2017
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 2014
-
Data release - as updated : Wheal Ellen prospect. Annual reports and final report to licence expiry/full surrender, for the period 26/8/2009 to 21/10/2017.
During the sixth licence year, on renewed EL 4354, no technical work was undertaken. Hillgrove Resources temporarily suspended exploration activities within EL 4354 – Wheal Ellen in 2010 to focus on the construction of the Kanmantoo copper mine....-
Document
Published: 08 Dec 2017
-
Coomandook and The Coorong [East] (part of the Padthaway Project). Final report at licences' joint full surrender, for the period 27/3/2014 to 26/3/2017.
The licensee's compilation of existing geological, geochemical and geophysical data has indicated to it that the Padthaway area is fertile for volcanogenic massive sulphide (VMS) style polymetallic mineralisation, with economic deposits possibly...-
Document
Published: 16 May 2017
-
Data release - as updated : Statton Hill (part of the Baratta Project). Annual reports, first partial surrender report and final report to licence full surrender, for the period 8/10/2007 to 14/1/2016.
Copper and gold exploration has been conducted within an area centred about 80 km east of Hawker, which it was thought had potential for epigenetic vein style mineralisation within buried Adelaidean sandstone and shale strata, formed in a stratabound...-
Document
Published: 19 Jan 2016
-
EL 6458 6783 Joint Annual Technical Report to period ending 08/11/2024
This report represents the Final Technical Report for EL 6458 and EL 6783. Originally Tri-Star was targeting coal resources within the Anderson Range Project. This focus shifted in 2021 to uranium conducive to insitu leaching, as well as metalliferous...-
Document
Published: 22 Nov 2024
-
RB 2009/00009 South Australian mineral resource production statistics for the 6 month [period] ended [31] December 2008.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2008, and compares the data with that returned for the previous six...-
Document
Published: 11 May 2009
-
SP 008 Mineral Resources of the Adelaide Geosyncline
This publication has been compiled from a display prepared for the launch of SADME Bulletin 53, held at the Australian Mineral Foundation on 7 December 1987. The importance and diversity of commodities found in the Geosyncline are highlighted in the...-
Document
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1978 to 28/9/1979.
As part of ongoing base metal exploration of the area surrounding Bute, initial work done after the expiry of EL 248 comprised the completion of one diamond drillhole to TD 411.2 m within Carpentarian basement, targeting a magnetic anomaly thought to...-
Document
Published: 20 Nov 1979
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1976 to 9/6/1978.
There is no abstract created for this record-
Document
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 2017
-
Mount Frome (part of the Flinders Ranges Project). Fourth partial surrender report, for the period 17/1/2000 to 16/6/2014.
Recently, seven small licence portions totalling 48 square km or ~19.3% of the former area of EL 4597 were relinquished on 16/6/2014 to comply in part with the terms of the 2013 renewal period of the Flinders Ranges Project tenement group's...-
Document
Published: 22 Jul 2014
-
Parndana, Middle River and Yerda (part of the Kangaroo Island Project). Joint annual reports, plus EL 4581 third partial surrender report, to licences' joint full surrender, for the period 19/10/2012 to 18/10/2015.
Monax Mining has being exploring since May 2005 along a 40 km stretch of the hinterland to the central-northern coast of Kangaroo Island, searching mainly for possible economic gold, silver and Mississippi Valley type base metal sulphide...-
Document
Published: 09 Mar 2016
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 2021
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 2012
-
Mineral Resource Potential Map Series - Encounter.
There is no abstract created for this record-
Map
Published: 01 Jun 2015
-
Mineral Resource Potential Map Series - Angaston.
There is no abstract created for this record-
Map
Published: 01 Jun 2015
-
Mineral Resource Potential Map Series - Cape Jervis.
There is no abstract created for this record-
Map
Published: 01 Jun 2015
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 2007
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 2017