-
Warrow. Progress and final relinquishment reports for the period 10/6/83 to 9/12/84.
Extensive geophysical prospecting, an 8 hole percussion drill coring programme (477 m) and a 140 hole RAB drilling programme (1798 m) at the Lady Franklin prospect were not encouraging. Percussion drillhole 83WP2 intersected a zone of primary but...-
Document
Published: 19 Dec 1984