-
Cedric Bore. Information status at licence expiry, for the period 18/6/2007 to 17/6/2008 : no work performed.
There is no abstract created for this record-
Document
Published: 16 Sep 1908
-
Cedric Bore. Annual reports plus final report to licence expiry/full surrender, for the period 2/4/2002 to 17/6/2008.
An area centred ~ 80 km north of Tarcoola was taken under licence to explore for possible economic buried precious and base metallic mineralisation hosted by Archaean and Proterozoic basement rocks. The area was selected on the basis of it having...-
Document
Published: 16 Sep 1908
-
Kapunda copper mine prospect. Reports on an assessment of the geology and mineralisation, and on commissioned ore beneficiation testwork later performed by Amdel, covering the period February 1972 until November 1979.
52 exploratory diamond cored (NQ) drillholes completed over the period December 1971 to May 1973, for a total penetration of 17, 687 feet.-
Document