-
Roxby Downs North (part of the Olympic Domain Project). Final report at licence surrender for the period 18/6/2007 to 17/6/2009.
During its 2-year tenure of EL 3810, which consisted of two parcels of ground situated 25 to 70 km north-west of the Olympic Dam mine, Copper Range undertook a review of existing geological and geophysical data and identified a ring structure and...-
Document
Published: 17 May 1909
-
Data release - as updated [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports for the period 8/4/2009 to 14/4/2019.
During the 2009-2010 reporting year, as part of the strategy to significantly advance the future development of the Hawks Nest Iron Ore Project, Western Plains Resources (WPG) successfully concluded a series of complex joint venture negotiations with...-
Document
Published: 01 Jun 1918
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Kapunda copper mine prospect. Reports on an assessment of the geology and mineralisation, and on commissioned ore beneficiation testwork later performed by Amdel, covering the period February 1972 until November 1979.
52 exploratory diamond cored (NQ) drillholes completed over the period December 1971 to May 1973, for a total penetration of 17, 687 feet.-
Document
-
Kapunda copper prospect. Exploration progress reports and related consultants' technical reports for the period February 1972 to April 1973.
There is no abstract created for this record-
Document
Published: 27 Apr 1973