-
Data release : Glen Oak (part of the Flinders Ranges Project). Final report at licence full surrender, for the period 18/9/2008 to 21/6/2013.
An area comprising two sub-blocks centred ~24 km north-west of Carrieton in the southern Flinders Ranges has been explored for possible buried diamondiferous kimberlite intrusions. The only work undertaken on EL 4184 was the acquisition of 10 small...-
Document
-
Glen Oak (part of the Springfield Project). Information status at licence surrender, for the period 9/9/2009 to 7/4/2016: no work performed.
There is no abstract created for this record-
Document
Published: 09 Oct 1915
-
Quorn, Glen Oak, Gilbert Hill and Willochra (all part of the Springfield Project). Joint partial surrender report for the overall period 4/11/2005 to 17/11/2009.
A detailed helicopter-borne low level magnetic survey was conducted over the Springfield Basin region during 2008 in search of kimberlite pipe and dyke targets. It was flown along north-south lines spaced 100 m apart, with a nominal sensor height...-
Document
-
Data release - as updated : Eurelia Diamond Project. Joint final report [no work letter] at the full surrenders of four of five project licences, for the period 1/1/2014 to 7/4/2016.
Regarding the now fully surrendered four subject licences, there was no work to report for the last two years when they had project joint reporting status, nor for during the prior period since 1/1/2011 when initially they had individual reporting...-
Document
Published: 17 Nov 1915
-
Springfield, Glen Oak, Willochra, Gilbert Hill, Quorn, Radford Creek and Kanyaka (the Springfield district tenement group within the Flinders Ranges Project). Joint annual report for the period 1/1/2011 to 31/12/2013.
Work said to have been completed during the 2011 reporting period included an inspection and limited sampling of retained historic Utah drill cores from the Copper Claim area, checking of the preliminary resource estimates made by Utah from its drill...-
Document
-
The Springfield Project [Part]. Data release at licences' partial relinquishment / full surrender: base metal exploration farminee's joint annual reports for the period 27/10/2006 to 31/12/2009.
Copper Range is exploring a number of the Springfield Project mineral tenements for base and precious metals under the terms of a joint venture agreement that it made with licensee Flinders Diamonds on 19/3/2007, whereby the latter retains all rights...-
Document
Published: 20 Aug 1910