Work said to have been completed during the 2011 reporting period included an inspection and limited sampling of retained historic Utah drill cores from the Copper Claim area, checking of the preliminary resource estimates made by Utah from its...
Work said to have been completed during the 2011 reporting period included an inspection and limited sampling of retained historic Utah drill cores from the Copper Claim area, checking of the preliminary resource estimates made by Utah from its drill results, the conduct of advanced leach tests on drill cuttings samples collected from copper-bearing units, the processing and interpretation of existing airborne magnetic data acquired over the Copper Claim area, and making field visits to locate water bores suitable for supplying water for a proposed drilling program [Note: only some of the results of this work (viz. the area's prospectivity assessment) were provided in the subject joint annual report, with attachments (otherwise unrelated) detailing mainly the metadata about stored drill core sampling, plus laboratory assay results for 4 core samples].
More +