-
Maitland. Progress reports and final report to licence full surrender, for the period 12/9/1979 to 7/5/1981.
Bedrock sampling and petrological examination (via the drilling of 266 shallow RAB holes, total penetration 3111 m), following the interpretation of airborne and ground geophysical surveys, did not succeed in locating a Middle Proterozoic...-
Document