-
Yarranna Hill (part of the Narlaby Palaeochannel Project). Data release made in lieu of submitting a first partial surrender report: progress reports for the period 25/10/1979 to 30/6/1981.
Drilling of 490 rotary drillholes (total 43,000 m) in EL 539, the majority being located on a 200 m grid spacing, has revealed the western end of a major Tertiary palaeochannel system, and has intersected significant and widespread subsurface uranium...-
Document