-
Andamooka, Stuart Creek, Arcoona, Lake Torrens, Todds Dam, Lake Arthur, Woodforde Hill and Murdie Island (the Stuart Shelf Project). Joint first partial surrender report at licences' expiry/renewal, for the period 2/5/1975 to 16/6/1986.
WMC's Stuart Shelf exploration activities from 1975 to 1985 have sought mainly Olympic Dam style mineralisation (copper - uranium - precious metals in haematitic breccia host rocks), with lesser emphasis directed at: possible distal analogues of the...-
Document
-
Princess Royal, Burra West, Burra North, Florieton, Mount Bryan, Burra Central, Mongolata, Redbanks, Hallett Hill and The Gums (the Burra Project tenement group). Joint annual reports for the period 1/5/2009 to 30/4/2017.
A multi-licence project area centred on the historic abandoned Burra copper mine is being explored for possible economic, buried Burra type copper oxide and copper carbonate mineralisation that may have formed within Neoproterozoic metasedimentary...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
The Flinders Ranges Project, Jamestown Group of tenements. Data release at partial surrender of subsequent licences: combined annual reports for the period 18/9/2004 to 31/12/2010.
Ten contiguous exploration licences in the Jamestown - Peterborough - Quorn region are being explored for possible economic diamonds associated with inferred buried kimberlite intrusions. Prior work done in the 1960s by Stockdale Exploration (a de...-
Document
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 1917
-
Data release - as updated [made at SA Director of Mines’ discretion] : (for 10 exploration licences comprising) the Lake Torrens JV Project. Joint annual reports for the period 1/1/2007 to 31/12/2011.
A group of ten, mainly adjoining licence areas occupying the plains surrounding the northern end of Lake Torrens, are now being jointly explored for possible economic buried Olympic Dam style IOCG related mineralisation that may have formed in the...-
Document
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2006 to 28/8/2012.
Twelve licence areas owned and operated by Gold Fields Australasia (GFA), comprising two subareas respectively located approximately 50 km east of Burra and 15 km south-east of the Benda Range, on the eastern edge of the Adelaide Fold Belt, are being...-
Document
Published: 29 Sep 1912
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 1 of 4 ].
A multi-licence area located between 65 km and 170 km south-east of Coober Pedy was taken up to explore for possible economic precious and base metal deposits that might lie concealed within shallow Proterozoic basement. Exploration activity during...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Bopeechee and Cadnia Hill/Stuart Creek and Porter Hill (The Lake Torrens Project). Data release made at two licences' surrender/two latter licences' fifth partial relinquishment: annual reports and final reports for the period 9/4/1998 to 31/12/2006.
The reports comprising this data release package describe exploration for economic deposits of base and precious metals that have possibly formed within Neoproterozoic metasediments, the underlying Palaeoproterozoic basement, and in Cambrian carbonate...-
Document
Published: 29 Sep 1909
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 1921
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2012 to 28/8/2014.
During Year 7 of the project, Goldfields did no more field work, but undertook office-based analyses of bedrock geochemical and geological data obtained in its 2012 aircore drilling campaign. Image processing and interpretation of the Canegrass...-
Document
Published: 28 Feb 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
Currency Creek and Langhorne Creek (formerly part of the Fleurieu JV Project, then part of the Adelaide Hills Project). Joint final report to licences' joint full surrender, for the period 4/6/1992 to 18/10/2016.
Two slightly separated areas located in the west-central Kanmantoo Trough geological region have been explored for possible economic buried metalliferous deposits by successive licence owners over an almost 25 year - long tenure. The subject report...-
Document
-
Data release [made at SA Director of Mines' discretion] : Central Gawler Craton Project. Joint annual reports ['no work' lettesr], for the period 17/7/2015 to 14/8/2018.
This project is a continuation by Rudy Gomez of his previous efforts, begun in January 1997, to explore the Lake Gairdner district for possible economic buried precious and base metal epithermal mineralisation of Olympic Dam or Tunkillia style within...-
Document
Published: 17 Aug 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Langhorne Creek, Bremer, Hartley and Currency Creek (the Fleurieu Project). Joint annual reports for the period 1/10/2008 to 30/9/2013.
In the sixth year of the project, the principal activity was the drilling of two inclined diamond holes for 633.5 m during October 2008 to investigate a possible northern buried extension of the known Rankine Trend mineralisation on EL 3641 ground...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908