-
Feasibility level geotechnical and hydrogeological studies, Moorlands coal deposit, Lobe E, Moorlands SA.
Drilling (132.8 metres) included fully cored geotechnical hole to basement to estimate mine planning constraints for open cut mining. The unconfined aquifer above the lignite must be dewatered for mine slope stability. Overburden contains 2 layers of...-
Document