RB 77/00039;Amdel 01149 Rehabilitation of Brukunga pyrites mine, 1976-1977.
In this period a revegetation trial was undertaken on the tailings dams, the availability of clay in the area suitable for sealing the main benches assessed and a chemical survey of Dawsley Creek in the mine area was made to assess the effects of a...-
Document
Published: 01 Jan 1977
-
RB 79/00094;Amdel 01278 Rehabilitation of Brukunga pyrites mine, July 1978 to June 1979 (Amdel report no. 1278).
In 1973 Amdel was requested by the Department of Mines and Energy to investigate the problem of water pollution in Dawesley Creek, apparently arising from the abandoned pyrites mine at Brukunga. Following the investigation of sources of pollution, a...-
Document
Published: 01 Jul 1979
-
Brukunga neutralisation pilot plant. Progress and final reports on laboratory studies and continuous operating performance under test conditions, for the period February 1975 to February 1976.
The objective of the present investigation was to obtain, by means of a continuous pilot plant, operating data for the appraisal and design of a full-scale neutralization plant for the treatment of acid mine drainage (AMD) at Brukunga. Laboratory...-
Document
-
Rehabilitation of Brukunga mine. Progress, final and miscellaneous reports for the period from November 1974 to April 1989.
There is no abstract created for this record-
Document
Published: 01 Jan 1989
-
RB 74/00222 Amdel 01015 Rehabilitation of Brukunga mine, Nairne Pyrites Ltd.
This investigation of the Brukunga mine site was prompted by the observed release of acid waters with high iron and other heavy metal concentrations into Dawesley Creek, the consequences of which could include possible pollution of Lake Alexandrina...-
Document
Published: 01 Nov 1974
-
RB 2015/00019 Manual of geochemical leaching trials, 2010–2014; Brukunga Mine Remediation Program - Phase 3.
The Brukunga mine site is a former open pit iron sulfide mine that continues to contribute to Acid and Metalliferous Drainage (AMD) into downstream waterways. Mine-based sources of AMD include the waste rock dumps and tailings storage facility. In...-
Document
Published: 01 Jun 2015
-
RB 2015/00016 Detailed design of the Days Creek Domain: Stage 1 of the progressive remediation of the Brukunga Mine Site.
The remediation of Days Creek represents the first stage of the progressive remediation of the Brukunga mine site. Objectives for the remediation of Days Creek domain were developed by the Technical Advisory Group (TAG) in association with DSD...-
Document
Published: 01 Nov 2015