Rehabilitation of Brukunga mine. Progress, final and miscellaneous reports for the period from November 1974 to April 1989.
Published: 01 Jan 1989 Created: 13 Nov 2024 Revised: 13 Nov 2024

There is no abstract created for this record

There is no abstract created for this record

    Downloads

    Name Description Download Select
    ENV02463.pdf

About this record

Record No mesac4412
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mining Environmental Program
Contributor Amdel Ltd
Sponsor Nairne Pyrites Ltd
Tenement
Tenement Holder
Operator
Geological Province Kanmantoo Trough
Mine Name Brukunga pyrite mine
Stratigraphy Nairne Pyrite Member
Commodity pyrite
Notes
Notes: Amdel project no. 1/1/145. Includes reports:  - Rehabilitation of Brukunga pyrites mine. July 1980 to June 1981. In the first full year of operation of the water treatment plant, the return of treated water to Dawsley Creek has diluted the...

Notes: Amdel project no. 1/1/145. Includes reports: - Rehabilitation of Brukunga pyrites mine. July 1980 to June 1981. In the first full year of operation of the water treatment plant, the return of treated water to Dawsley Creek has diluted the acid-mine-drainage which is still reaching the creek. - Rehabilitation of Brukunga pyrites mine. July 1981 to June 1982. ystematic sampling of water from Dawsley Creek and within the mine area to provide a database to permit comparison of the effects of various pollution control schemes constructed by the EWS. These schemes include channelling of rain water off the mine benches, collection of principal polluting flows and diversion to the tailings dam pond, and since July 1980, an acid neutralisation plant. - Rehabilitation of Brukunga pyrites mine. July 1982 to June 1983. Amdel project: 1/1/145. Report no. 01507. - Rehabilitation of Brukunga pyrites mine. July 1983 to June 1984. Amdel project: 1/1/145. Report no. 01550. Env includes progress report 1, vol 3, fiche: , p: 467-477. - Rehabilitation of Brukunga pyrites mine. July 1984 to June 1985. - Rehabilitation of Brukunga pyrites mine. July 1985 to June 1986. - Rehabilitation of Brukunga pyrites mine. Neutralisation plant design. Geographic Locality: Mount Lofty Ranges;Dawesley Creek Doc No: Env 02463

More +

Language English
Metadata Standard ISO 19115-3

Citations

Use constraints License
License Creative Commons Attribution 4.0
Persistent identifier https://pid.sarig.sa.gov.au/document/mesac4412
Citation 1989. Rehabilitation of Brukunga mine. Progress, final and miscellaneous reports for the period from November 1974 to April 1989. Mineral Company Report - Mining Environmental Program
https://pid.sarig.sa.gov.au/document/mesac4412

Technical information

Status
Maintenance and Update Frequency
Geographic Reference GDA2020 (EPSG:7844)
Geo bounding box {"type":"Polygon","coordinates":[[[138.5,-35.5],[139,-35.5],[139,-35],[138.5,-35],[138.5,-35.5]]]}
Purpose

                    
                    

                    
                  
Lineage