-
RB 77/00085 Amdel 01170 Rehabilitation of Brukunga pyrites mines. Mullock heap revegetation.
A trial revegetation of the mullock heaps was carried out. A significant reduction in the level of pollution in the Dawsley Creek has been achieved by the partial diversion scheme with acidity levels of the order of one-third of those values prior to...-
Document
Published: 01 Jan 1977
-
RB 77/00039;Amdel 01149 Rehabilitation of Brukunga pyrites mine, 1976-1977.
In this period a revegetation trial was undertaken on the tailings dams, the availability of clay in the area suitable for sealing the main benches assessed and a chemical survey of Dawsley Creek in the mine area was made to assess the effects of a...-
Document
Published: 01 Jan 1977
-
RB 66/00119 Report on Nairne pyrite deposit, Brukunga, Hd Kanmantoo - Nairne Pyrites Pty Ltd.
In August 1966, a request for assistance with conducting pyritic sulphur exploration in the vicinity of Brukunga was received by the SA Department of Mines from Nairne Pyrites Pty Ltd. Brukunga is 29 miles east of Adelaide by road and 3.5 miles north...-
Document
Published: 01 Jan 1968
-
RB 74/00222 Amdel 01015 Rehabilitation of Brukunga mine, Nairne Pyrites Ltd.
This investigation of the Brukunga mine site was prompted by the observed release of acid waters with high iron and other heavy metal concentrations into Dawesley Creek, the consequences of which could include possible pollution of Lake Alexandrina...-
Document
Published: 01 Nov 1974