Brukunga neutralisation pilot plant. Progress and final reports on laboratory studies and continuous operating performance under test conditions, for the period February 1975 to February 1976.
The objective of the present investigation was to obtain, by means of a continuous pilot plant, operating data for the appraisal and design of a full-scale neutralization plant for the treatment of acid mine drainage (AMD) at Brukunga. Laboratory...-
Document
-
Rehabilitation of Brukunga mine. Progress, final and miscellaneous reports for the period from November 1974 to April 1989.
There is no abstract created for this record-
Document
Published: 01 Jan 1989
-
RB 74/00222 Amdel 01015 Rehabilitation of Brukunga mine, Nairne Pyrites Ltd.
This investigation of the Brukunga mine site was prompted by the observed release of acid waters with high iron and other heavy metal concentrations into Dawesley Creek, the consequences of which could include possible pollution of Lake Alexandrina...-
Document
Published: 01 Nov 1974
-
RB 2015/00019 Manual of geochemical leaching trials, 2010–2014; Brukunga Mine Remediation Program - Phase 3.
The Brukunga mine site is a former open pit iron sulfide mine that continues to contribute to Acid and Metalliferous Drainage (AMD) into downstream waterways. Mine-based sources of AMD include the waste rock dumps and tailings storage facility. In...-
Document
Published: 01 Jun 2015
-
RB 2015/00016 Detailed design of the Days Creek Domain: Stage 1 of the progressive remediation of the Brukunga Mine Site.
The remediation of Days Creek represents the first stage of the progressive remediation of the Brukunga mine site. Objectives for the remediation of Days Creek domain were developed by the Technical Advisory Group (TAG) in association with DSD...-
Document
Published: 01 Nov 2015