RB 66/00119 Report on Nairne pyrite deposit, Brukunga, Hd Kanmantoo - Nairne Pyrites Pty Ltd.
In August 1966, a request for assistance with conducting pyritic sulphur exploration in the vicinity of Brukunga was received by the SA Department of Mines from Nairne Pyrites Pty Ltd. Brukunga is 29 miles east of Adelaide by road and 3.5 miles north...-
Document
Published: 01 Jan 1968
-
RB 2015/00019 Manual of geochemical leaching trials, 2010–2014; Brukunga Mine Remediation Program - Phase 3.
The Brukunga mine site is a former open pit iron sulfide mine that continues to contribute to Acid and Metalliferous Drainage (AMD) into downstream waterways. Mine-based sources of AMD include the waste rock dumps and tailings storage facility. In...-
Document
Published: 01 Jun 2015
-
RB 2015/00016 Detailed design of the Days Creek Domain: Stage 1 of the progressive remediation of the Brukunga Mine Site.
The remediation of Days Creek represents the first stage of the progressive remediation of the Brukunga mine site. Objectives for the remediation of Days Creek domain were developed by the Technical Advisory Group (TAG) in association with DSD...-
Document
Published: 01 Nov 2015
-
RB 79/00023 Brukunga pyrite mine - Drillhole analyses and mine development plan inventory.
BHP have provided SADME with unpublished data on the inoperative Brukunga pyrite mine. This report is an inventory of these data, providing access to the mine development plans and analytical data on two diamond drill holes.-
Document
Published: 01 Jan 1979