-
1987 seismic survey, Cooltong, final report.
AIM: A detailed grid of 9 lines totalling 71.6 line kms was shot in this survey to firm up two previously recognised but insufficiently profiled leads mapped on line OC85-22, near the Renmark Trough Permian depocentre. METHODS: Survey dates: 23 July -...-
Document
-
PEL 16. Progress and technical reports for the period 16/6/80 to 15/5/90.
Reports document the petroleum exploration history and search philosophy behind PEL 16 over two licence terms, and provide some new raw and interpretative geophysical and geochemical data based on the conduct of 5 seismic surveys and the drilling of 2...-
Document
Published: 15 May 1990