-
Progress and final reports PEL 3 SA and PEP 64 (Vic.) 1969-1971.
Operations which encompassed ground in SA and Victoria comprised two major projects, the Sunset seismic survey (190 line-km in SA), and a three hole drilling programme (Nadda 1 in SA - see Env 1350 for well completion report). The survey showed the...-
Document
Published: 01 Jan 1971