1990 Greenways Seismic Survey proposals. Reports for the period 9/2/90 to 6/3/91.
AIM: To acquire 18 line kms of detail seismic to firm up a drilling prospect, to satisfy the carried-over part of the PEL 38 Year 1 licence work commitment. In actuality this survey was not carried out: instead the licensees elected in April 1991 to...-
Document
-
1992 detail seismic survey, Greenways, final report.
AIM: To acquire a minimum of 50 line kms of detail seismic by 31 March 1992, to satisfy the varied PEL 38 Year 2 licence work commitment. Following the drilling of Greenways 1 (VP 296, line OHE 86-134), where a drillstem test run in a basal Eumeralla...-
Document