2013 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna). -Emergency response exercises conducted during...-
Document
Published: 19 Feb 2016
-
2015 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna). -Emergency response exercises conducted during...-
Document
Published: 21 Apr 2017
-
2017 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report for the period 1 January 2017 to 31 December 2017 covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna)....-
Document
Published: 29 Nov 2018
-
2016 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna). -Emergency response exercises conducted during...-
Document
Published: 26 Oct 2018
-
2019 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report for the period 1 January 2019 to 31 December 2019 covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna)....-
Document
Published: 21 Dec 2020
-
2018 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report for the period 1 January 2018 to 31 December 2018 covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna)....-
Document
Published: 17 Feb 2020
-
2014 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna). -Emergency response exercises conducted during...-
Document
Published: 21 Mar 2016
-
Mawson 2. Test reports.
Contains open hole drillstem test raw field data, the results and interpretation of the RFT pressure survey conducted in January 1988, the results of the modified isochronal gas production test of the Patchawarra Formation gas reservoir perforated...-
Document
-
Gidgealpa 35. Test reports.
There is no abstract created for this record-
Document
-
Gidgealpa 39. Test reports.
There is no abstract created for this record-
Document
-
Gidgealpa 38. Test reports.
There is no abstract created for this record-
Document
-
Gidgealpa 19. Test reports.
There is no abstract created for this record-
Document
-
Gidgealpa 33. Test reports.
There is no abstract created for this record-
Document
Published: 22 Nov 1992
-
Kurunda 4. Test reports.
There is no abstract created for this record-
Document
-
Gidgealpa 027 Test reports.
There is no abstract created for this record-
Document
-
Gidgealpa 31. Test reports.
There is no abstract created for this record-
Document
Published: 26 Feb 1990
-
Gidgealpa Field studies. Technical reports and data.
There is no abstract created for this record-
Document
Published: 09 Sep 1992
-
Mawson 1. Test reports.
Contains open hole drillstem test raw field data, the field contractor's 1987 results for the initial production flow testing of the separately perforated upper and lower Poolowanna Formation oil sands, the results of subsequent gas production tests,...-
Document
-
Gidgealpa 24. Test reports.
Gidgealpa No.24, located within PPL6, reached a total depth of 2065.9m on 27/02/85. It was designed to provide a crestal and northern drainage point for the Namur/Hutton. The well encountered 6ft of Basal Birkhead pay not prognosed, discovered a...-
Document
Published: 16 Feb 1987
-
Petrographic assessment of cores from Gidgealpa 42, 44 and 49.
44 core plugs from Gidgealpa 42, 44 and 49 were submitted for thin section preparation, petrographic analysis and photography. The client was interested in any interpretations regarding petrographic variations between wells, including primary facies...-
Document
Published: 09 Sep 1992