-
Ardrossan Dolomite Quarry - Program for Environment Protection and Rehabilitation (MPEPR2020/007).
There is no abstract created for this record-
Document
-
RB 99/00032 Trial dewatering of the BHP dolomite quarry at Ardrossan, South Australia.
Trial dewatering of the quarry, which is excavated in fractured and well-bedded Cambrian dolomite, took place for at least 56 days during early 1994, but pumping was terminated when a further significant water level drawdown could not be achieved. Ten...-
Document
Published: 01 Dec 1999
-
Mining Lease Proposal. Miscellaneous Purposes Licence Application - Ardrossan Dolomite Quarry Mine Waste Rock Area and Haul Road.
There is no abstract created for this record-
Document
Published: 29 Oct 2009
-
Peculiar Knob Iron Ore Mine - Program for Environment Protection and Rehabilitation (PEPR) 2017 Update.
There is no abstract created for this record-
Document
-
Annual Compliance Report 2017 for Ardrossan.
There is no abstract created for this record-
Document
-
Peculiar Knob Iron, Rare Earths mine - Annual Compliance Report 2016-2017 WPC-181.
PECULIAR KNOB, a deposit of 2 NE-trending sub-parallel, elongate lenses of coarse grained, specular hematite in host granitoid of the Mount Woods Complex. Both lodes pinch and swell along strike, both dip steeply to NW. There are minor offsets of the...-
Document
-
Arrium Mining. Peculiar Knob Iron, Rare Earths mine. 2015/2016 Compliance Report.
PECULIAR KNOB, a deposit of 2 NE-trending sub-parallel, elongate lenses of coarse grained, specular hematite in host granitoid of the Mount Woods Complex. Both lodes pinch and swell along strike, both dip steeply to NW. There are minor offsets of the...-
Document
-
Peculiar Knob Iron Mine Supplementary Mining Lease & MPL proposal = appendices (MC04367).
PECULIAR KNOB, a deposit of 2 NE-trending sub-parallel, elongate lenses of coarse grained, specular hematite in host granitoid of the Mount Woods Complex. Both lodes pinch and swell along strike, both dip steeply to NW. There are minor offsets of the...-
Document
-
Arrium Mining - Peculiar Knob - 2014/2015 Compliance Report - WPC-157.
There is no abstract created for this record-
Document