-
Pernatty Lagoon. Progress reports [Year 1 subset] for the period 1/12/1966 to 30/11/1967.
Ongoing evaluation work undertaken by Austminex at the Mount Gunson copper deposit has included geological mapping, rock rippability testing by bulldozer, the conduct of IP surveys, a further campaign of infill and exploratory drilling (726 holes...-
Document
-
[ Report on drilling ] Evaluation of the East Lagoon orebody, Mount Gunson, South Australia.
This report presents the results of ore definition drilling derived from 60 percussion and diamond drill holes put down over the central and southern parts of the East Lagoon orebody, and gives the methodology for calculating currently mineable ore...-
Document
-
Evaluation of the East Lagoon orebody, Mount Gunson, South Australia.
In December 1969, it was decided that the mining at Mount Gunson, scheduled to start in late April 1970, would commence with the development of the East Lagoon orebody. This orebody was selected because it appeared to contain the highest grade...-
Document
Published: 30 Apr 1970
-
Mount Gunson - Pernatty Lagoon area. Progress report to licence expiry/renewal for the period 1/12/1968 to 30/11/1970.
Evaluation of the East and West Lagoon areas included 9348 feet of percussion drilling and an IP survey. The conduct of test SP and VHF EM surveys gave no interpretable response. The mineralisation is erratic, and concentrated at the Pandurra...-
Document
Published: 22 Dec 1970
-
Mount Gunson regional plans and reports.
Includes results of diamond drilling at Pernatty Lagoon to check reserves estimated from results of percussion drilling, and results of percussion drilling at the House workings to extend indicated reserves of run-of-mine grade sulphide ore....-
Document
Published: 01 Jan 1968
-
Gunyah Lake sheet, Mount Gunson.
Plans include drill hole locations and IP traverses, bedrock lithology, structure contours (top of Pandurra Formation, top of Whyalla Sandstone) and a grade control map.-
Document
Published: 01 Jan 1975