-
Baratta. Progress and final reports for the period 27/5/1971 to 26/4/1972.
An airborne spectrometer/magnetometer survey of the Upper Proterozoic rocks of the northern Bibliando Dome, covering 877 line miles at approximately a height above ground level of 300 feet and line spacing of 1000 feet, was conducted by joint venturer...-
Document
-
Baratta copper prospect, South Australia. Appendix 1 to final report for the period ended 26/4/1972.
There is no abstract created for this record-
Document
-
Drilling report, Olary Province SMLs 534, 535, 579 and 615, for the period Nov-Dec 1971. Appendix 1 to SML 615 quarterly progress report for the period ended 5/11/1971.
There is no abstract created for this record-
Document
Published: 23 Dec 1971